Linear Programming Model Applied to Long-Term Mine Planning in Strip Mining Operations

被引:0
|
作者
Bassani, Marcel Antonio Arcari [1 ]
Guimaraes, Octavio R. A. [2 ]
Tavares, Flavio H. [2 ]
Cantadori, Breno [3 ]
Vicenzi, Ricardo [4 ]
Alves, Joao Lucas de Oliveira [5 ]
Mariz, Jorge Luiz Valenca [5 ]
Peroni, Rodrigo de Lemos [6 ]
机构
[1] Univ Fed Rio Grande do Sul, Min Engn Dept, Sect 4, 9500 Bento Goncalves Ave,Bldg 43427,Room 130, Porto Alegre, Brazil
[2] Alcoa, Rodovia PA 257,5,KM 0, Juruti, PA, Brazil
[3] Prominas Min, 1465 11th Paraiba St, Belo Horizonte, MG, Brazil
[4] Univ Fed Bahia, Polytech Sch, Mat Sci & Technol Dept, 02 Prof Aristides Novis Ave BA, BR-40210630 Salvador, Brazil
[5] Fed Univ Rio Grande do Sul UFRGS, Min Engn Dept, Sect 4, 9500 Bento Goncalves Ave,Bldg 43427,Room 103, Porto Alegre, RS, Brazil
[6] Fed Univ Rio Grande do Sul UFRGS, Min Engn Dept, Sect 4, 9500 Bento Goncalves Ave,Bldg 43427,Room 101, Porto Alegre, RS, Brazil
关键词
Optimization; Grade constraints; Bauxite operations; Scheduling; Sequencing;
D O I
10.1007/s42461-025-01185-5
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
Strip mining is largely employed in horizontal tabular deposits near the surface, such as coal and bauxite deposits. The deposit is first divided into panels, which are mined using parallel cuts called strips. The strips are a set of contiguous and subsequent blocks. The challenge is to determine the year of extraction of a set of blocks to maximize the total profit while respecting a series of boundary constraints. Many algorithms have been developed to solve this problem in an open-pit context. However, their application to strip mining operations has not been fully tested. In this paper, we propose a method to indicate the best period of extraction for each block in this kind of surface mining method. First, the method finds the best block sequence within each panel. Second, a linear programming model is used to find the optimal ore mass coming from each panel that maximizes the total profit. Last, the results of the panel optimization are used to update the block model at the block scale. The optimization is performed sequentially for a number of periods/years. The methodology is illustrated in a case study with data obtained from a real bauxite mine. The results show a feasible mine schedule that honours the mining capacity.
引用
收藏
页码:737 / 750
页数:14
相关论文
共 50 条
  • [1] A linear programming model for long-term mine planning in the presence of grade uncertainty and a stockpile
    Koushavand Behrang
    Askari-Nasab Hooman
    Deutsch Clayton V.
    International Journal of Mining Science and Technology, 2014, 24 (04) : 451 - 459
  • [2] A linear programming model for long-term mine planning in the presence of grade uncertainty and a stockpile
    Behrang, Koushavand
    Hooman, Askari-Nasab
    Clayton, Deutsch, V
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2014, 24 (04) : 451 - 459
  • [3] Improving an Integer Linear Programming Model of an Ecovat Buffer by Adding Long-Term Planning
    de Goeijen, Gijs J. H.
    Smit, Gerard J. M.
    Hurink, Johann L.
    ENERGIES, 2017, 10 (12)
  • [4] LONG-TERM PLANNING OF A MAJOR NATIONAL SECTOR USING A LINEAR-PROGRAMMING MODEL
    KURU, S
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1988, 36 (02) : 153 - 166
  • [5] A mine planning model to satisfy long-term grade targets
    Everett, J.
    Rimes, M.
    TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION B-APPLIED EARTH SCIENCE, 2010, 119 (03): : 183 - 187
  • [6] A mine planning model to satisfy long-term grade targets
    Everett, J. E. ev
    Rimes, M.
    IRON ORE CONFERENCE 2007, PROCEEDINGS, 2007, : 79 - +
  • [7] Geometallurgical model of a copper sulphide mine for long-term planning
    Compan, G.
    Pizarro, E.
    Videla, A.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2015, 115 (06) : 549 - 556
  • [8] LONG-TERM MINE PLANNING AT SYNCRUDE
    DONALD, D
    CIM BULLETIN, 1988, 81 (911): : 98 - &
  • [9] Planning the mining operations at Kumtor mine
    Rogers, T.
    Schlesser, F.
    Chunuev, I.K.
    Gornyi Zhurnal, 2001, (10): : 105 - 112
  • [10] Sustainability in Long-Term Surface Mine Planning: A Systematic Review of Operations Research Applications
    Aghdamigargari, Mehri
    Avane, Sylvester
    Anani, Angelina
    Adewuyi, Sefiu O.
    SUSTAINABILITY, 2024, 16 (22)