Hybridizing constraint programming and meta-heuristics for multi-mode resource-constrained multiple projects scheduling Problem

被引:0
|
作者
Ahmeti, Arben [1 ]
Musliu, Nysret [1 ]
机构
[1] TU Wien, Inst Log & Computat, Christian Doppler Lab Artificial Intelligence & Op, DBAI, Vienna, Austria
关键词
Project scheduling; Meta-heuristic algorithms; Constraint programming; Hybrid approach;
D O I
10.1007/s10732-024-09540-3
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The Multi-Mode Resource-Constrained Multiple Projects Scheduling Problem (MMRCMPSP) is an important combinatorial optimization problem for both real-world situations in industry and academic research. Its objective is to find the best schedule for activities across multiple projects that can be executed in different modes. The schedule must consider shared resource availability and satisfy precedence and time constraints. To tackle this problem, we propose a hybrid approach that combines constraint programming (CP) with meta-heuristic algorithms. We introduce and assess a CP model that incorporates all MMRCMPSP constraints. By leveraging the strengths of CP and meta-heuristics, our approach yields new upper bounds for various MMRCMPSP benchmark instances. Additionally, we evaluate our method using existing benchmark instances for single-project scheduling problems with multiple modes and provide improved solutions for many of them.
引用
收藏
页码:35 / 37
页数:3
相关论文
共 50 条
  • [1] New meta-heuristics for the resource-constrained project scheduling problem
    Andrew Lim
    Hong Ma
    Brian Rodrigues
    Sun Teck Tan
    Fei Xiao
    Flexible Services and Manufacturing Journal, 2013, 25 : 48 - 73
  • [2] New meta-heuristics for the resource-constrained project scheduling problem
    Lim, Andrew
    Ma, Hong
    Rodrigues, Brian
    Tan, Sun Teck
    Xiao, Fei
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2013, 25 (1-2) : 48 - 73
  • [3] Reactive heuristics for disrupted multi-mode resource-constrained project scheduling problem
    Elloumi, Sonda
    Loukil, Taicir
    Fortemps, Philippe
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 167
  • [4] A Constraint Programming Formulation of the Multi-Mode Resource-Constrained Project Scheduling Problem for the Flexible Job Shop Scheduling Problem
    Yuraszeck, Francisco
    Montero, Elizabeth
    Canut-De-Bon, Dario
    Cuneo, Nicolas
    Rojel, Maximiliano
    IEEE ACCESS, 2023, 11 : 144928 - 144938
  • [5] Hybrid Heuristics for Multi-mode Resource-Constrained Project Scheduling
    Tchao, Celso
    Martins, Simone L.
    LEARNING AND INTELLIGENT OPTIMIZATION, 2008, 5313 : 234 - +
  • [6] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283
  • [7] A multi-mode resource-constrained scheduling problem in the context of port operations
    Lorenzoni, Luciano Lessa
    Ahonen, Hannu
    Gomes de Alvarenga, Arlindo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2006, 50 (1-2) : 55 - 65
  • [8] Modeling of the flexible resource-constrained multi-mode project scheduling problem
    School of Management, Wuhan University of Technology, Wuhan 430070, China
    不详
    Wuhan Ligong Daxue Xuebao, 2008, 11 (176-179+188):
  • [9] Multi-mode resource-constrained project scheduling problem with activities overlapping
    Chu Z.
    Xu Z.
    Yu J.
    Xu, Zhe (xuzhebuaa@163.com), 1600, CIMS (23): : 557 - 566
  • [10] Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with SMT
    Bofill, Miquel
    Coll, Jordi
    Suy, Josep
    Villaret, Mateu
    2016 IEEE 28TH INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE (ICTAI 2016), 2016, : 239 - 246