Hybridizing constraint programming and meta-heuristics for multi-mode resource-constrained multiple projects scheduling Problem

被引:0
|
作者
Ahmeti, Arben [1 ]
Musliu, Nysret [1 ]
机构
[1] TU Wien, Inst Log & Computat, Christian Doppler Lab Artificial Intelligence & Op, DBAI, Vienna, Austria
关键词
Project scheduling; Meta-heuristic algorithms; Constraint programming; Hybrid approach;
D O I
10.1007/s10732-024-09540-3
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The Multi-Mode Resource-Constrained Multiple Projects Scheduling Problem (MMRCMPSP) is an important combinatorial optimization problem for both real-world situations in industry and academic research. Its objective is to find the best schedule for activities across multiple projects that can be executed in different modes. The schedule must consider shared resource availability and satisfy precedence and time constraints. To tackle this problem, we propose a hybrid approach that combines constraint programming (CP) with meta-heuristic algorithms. We introduce and assess a CP model that incorporates all MMRCMPSP constraints. By leveraging the strengths of CP and meta-heuristics, our approach yields new upper bounds for various MMRCMPSP benchmark instances. Additionally, we evaluate our method using existing benchmark instances for single-project scheduling problems with multiple modes and provide improved solutions for many of them.
引用
收藏
页码:35 / 37
页数:3
相关论文
共 50 条
  • [41] A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags
    Majid Sabzehparvar
    S. Mohammad Seyed-Hosseini
    The Journal of Supercomputing, 2008, 44 : 257 - 273
  • [42] A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty
    Sadeghloo, Maryam
    Emami, Saeed
    Divsalar, Ali
    ANNALS OF OPERATIONS RESEARCH, 2024, 339 (03) : 1637 - 1677
  • [43] Memetic algorithm for multi-mode resource-constrained project scheduling problems
    Shixin Liu
    Di Chen
    Yifan Wang
    Journal of Systems Engineering and Electronics, 2014, 25 (04) : 609 - 617
  • [44] Local search for nonpreemptive multi-mode resource-constrained project scheduling
    Kolisch, R
    Drexl, A
    IIE TRANSACTIONS, 1997, 29 (11) : 987 - 999
  • [45] Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem
    Kannimuthu, Marimuthu
    Raphael, Benny
    Ekambaram, Palaneeswaran
    Kuppuswamy, Ananthanarayanan
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (04) : 893 - 916
  • [46] Scatter Search for Multi-mode Resource-constrained Project Scheduling Problems
    Pourghaderi, A. R.
    Torabi, S. A.
    Talebi, J.
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 163 - 167
  • [47] Multi-mode resource-constrained scheduling for complex product design tasks
    Li, Yingzi
    Zhang, Shuo
    Zhang, Xiaodong
    Luo, Le
    MATERIALS AND MANUFACTURING TECHNOLOGY, PTS 1 AND 2, 2010, 129-131 : 566 - 571
  • [48] Multi-mode resource-constrained project scheduling with uncertain activity cost
    Xie, Fang
    Li, Haitao
    Xu, Zhe
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 168
  • [49] A faster exact method for solving the robust multi-mode resource-constrained project scheduling problem
    Bold, Matthew
    Goerigk, Marc
    OPERATIONS RESEARCH LETTERS, 2022, 50 (05) : 581 - 587
  • [50] A Modified NSGA-II for the Multiobjective Multi-mode Resource-Constrained Project Scheduling Problem
    Vanucci, Sanderson C.
    Bicalho, Rafael
    Carrano, Eduardo G.
    Takahashi, Ricardo H. C.
    2012 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2012,