Research on Refined Girder-End Displacement Calculation for Long-Span Railway Bridge

被引:0
|
作者
Yuan, Renan [1 ,2 ]
Xiao, Haizhu [1 ,2 ]
Wang, Zhen [1 ,2 ]
机构
[1] China Railway Major Bridge Reconnaissance & Design Institute Co., Ltd., Wuhan,430056, China
[2] State Key Laboratory of Bridge Intelligent and Green Construction, Wuhan,430034, China
关键词
Trusses;
D O I
10.20051/j.issn.1003-4722.2024.06.018
中图分类号
学科分类号
摘要
Girder-end expansion devices are critical to the running safety of trains on the long-span railway bridges as well as the service performance of the bridges. In this paper, refined calculations were conducted to investigate the girder-end displacements induced by thermal loads, train loads, wind loads, and combined wind and thermal loads, on the basis of the data of measured girder-end displacements and structural calculations of multiple long-span bridges. The types and ranges of thermal loads are suggested. The loading cases and methods to calculate the girder-end displacements induced by train loads are determined. The values of friction cocfficients of wind loads for trusses as well as the loading cases selected to calculate the girder-end displacements induced by wind loads are provided. The wind load reduction factors related to the combination of wind and thermal loads are calculated in the wind load model and the unified distribution model of wind and thermal loads. The proposed method has been applied to calculate the girder-end displacements of a cable-stayed bridge, and compared with the calculation efficiency of the conventional methods. It is concluded that the girder-end displacement induced by thermal loads is highly associated with the system temperature, during the fall of the system temperature, the temperatures of structurcs draw the values of atmospheric temperatures, while during the risc of the system temperature, heat radiation effect should be considered for the stay cables and half of the superstructure, and the temperatures of the pylons and the other half of the superstructure draw the values of atmospheric temperatures. The boundary resistance effects of the dampers and hearings should be considered, the dynamic time history method was used to calculate the girder-end displacements induced by train loads, the calculated results agreed well with the measured values. For the truss bridge, the girder-end displacements induced by wind loads calculated at wind yaw angles of 45° and 90°, and the most unfavorable values were selected. When calculating the girder-end displacement combinations under the action of wind and thermal loads, the displacements induced by wind loads should be discounted. The girdcr-end displacements calculated by the conventional methods were conservative, it is a better option to select the girder-end displacements via refined calculation. © 2024 Wuhan Bridge Media Co., Ltd., MBEC. All rights reserved.
引用
收藏
页码:133 / 139
相关论文
共 50 条
  • [31] Study of Vertical Stiffness Evaluation Method of Long-Span Steel Truss Girder Cable-Stayed Railway Bridge
    Zheng, Xiao-Long
    Xu, Xin-Yu
    Gao, Mang-Mang
    Yang, Guo-Jing
    Zhou, Chuan-Jiang
    Bridge Construction, 2022, 52 (03): : 24 - 29
  • [32] Research on the CWR Track of Long-span Continuous Beam of Sea-crossing Railway Bridge
    Zhang, Jian
    Liu, Junying
    Li, Dacheng
    Journal of Railway Engineering Society, 2022, 39 (04) : 48 - 53
  • [33] A NOVEL MOVABLE SCAFFOLDING SYSTEM (MSS) FOR A LONG-SPAN CURVED GIRDER BRIDGE
    Chen, Zeng-shun
    Zhou, Jian-ting
    Hu, Gang
    Li, Yong
    Ma, Hu
    Yao, Guo-wen
    INTERNATIONAL JOURNAL OF ROBOTICS & AUTOMATION, 2017, 32 (02): : 164 - 175
  • [34] Seismic system of long-span composite girder cable-stayed bridge
    Jia Y.
    Zhao R.-D.
    Zhao C.-G.
    Li F.-H.
    Xu Z.-Q.
    Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2020, 50 (06): : 2167 - 2177
  • [35] A novel movable scaffolding system (MSS) for a long-span curved girder bridge
    Chen, Zeng-Shun
    Zhou, Jian-Ting
    Hu, Gang
    Li, Yong
    Ma, Hu
    Yao, Guo-Wen
    International Journal of Robotics and Automation, 2017, 32 (02) : 164 - 175
  • [36] Flutter performance optimization of a long-span truss girder bridge in mountainous canyon
    Yousaf, Muhammad Roshan
    Lei, Yongfu
    Li, Mingshui
    JOURNAL OF VIBROENGINEERING, 2021, 23 (05) : 1230 - 1243
  • [37] Checking Calculation Analysis for Construction of Long-span Steel Box Girder Bridges
    He, Li
    Zhu, Wenwei
    Mei, Shiqiang
    Xie, Xinji
    2018 INTERNATIONAL SEMINAR ON COMPUTER SCIENCE AND ENGINEERING TECHNOLOGY (SCSET 2018), 2019, 1176
  • [38] Deep learning-based reconstruction of missing long-term girder-end displacement data for suspension bridge health monitoring
    Wang, Zhi-wei
    Lu, Xiao-fan
    Zhang, Wen-ming
    Fragkoulis, Vasileios C.
    Beer, Michael
    Zhang, Yu-feng
    COMPUTERS & STRUCTURES, 2023, 284
  • [39] Long-span bridge aerodynamics
    Ge, Yaojun
    Tanaka, Hiroshi
    Advanced Structural Wind Engineering, 2013, : 85 - 120
  • [40] Research on the dynamic effect of long-span railway bridge pier based on real blasting seismic waves
    Li, Sheng-Lin
    Liu, Dian-Shu
    Cui, Ying-Wei
    Zhao, He-Yun
    Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology, 2015, 35 (02): : 123 - 126