Analysis and Improvement of the Risk Assessment System Based on the Risk Priority Number

被引:0
|
作者
Samara State Technical University, Samara [1 ]
443100, Russia
机构
[1] Samara State Technical University,
来源
Russ. Eng. Res. | / 7卷 / 1026-1029期
关键词
Compendex;
D O I
10.3103/S1068798X24701429
中图分类号
学科分类号
摘要
Presses (machine tools)
引用
收藏
页码:1026 / 1029
页数:3
相关论文
共 50 条
  • [1] Improvement of the Risk Assessment System Based on the FMEA Action Priority Method
    Panyukov, D.I.
    Nenashev, M.V.
    Kozlovskii, V.N.
    Aidarov, D.V.
    Russian Engineering Research, 2024, 44 (07) : 1030 - 1034
  • [2] New Means to Risk-Priority-Number for System Improvement
    Sorooshian, Shahryar
    QUALITY-ACCESS TO SUCCESS, 2019, 20 (171): : 18 - 20
  • [3] Risk Analysis of Propulsion System based on Similarity Measure and Weighted Fuzzy Risk Priority Number in FMEA
    Zhou, Hang
    Yang, Yuan-Jian
    Huang, Hong-Zhong
    Li, Yan-Feng
    Mi, Jinhua
    Yang, Yuan-Jian (hzhuang@uestc.edu.cn), 1600, De Gruyter Open Ltd (38): : 163 - 172
  • [4] Risk Analysis of Propulsion System based on Similarity Measure and Weighted Fuzzy Risk Priority Number in FMEA
    Zhou, Hang
    Yang, Yuan-Jian
    Huang, Hong-Zhong
    Li, Yan-Feng
    Mi, Jinhua
    INTERNATIONAL JOURNAL OF TURBO & JET-ENGINES, 2021, 38 (02) : 163 - 172
  • [5] Total efficient risk priority number (TERPN): a new method for risk assessment
    Di Bona, Gianpaolo
    Silvestri, Alessandro
    Forcina, Antonio
    Petrillo, Antonella
    JOURNAL OF RISK RESEARCH, 2018, 21 (11) : 1384 - 1408
  • [6] Definition and analysis of a new risk priority number concept
    Braband, J
    PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL 1- 6, 2004, : 2006 - 2011
  • [7] An Improved Risk Priority Number Method Based on AHP
    Zhao, Youhu
    Fu, Guicui
    Wan, Bo
    59TH ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS), 2013,
  • [8] The Risk Priority Number Evaluation of FMEA Analysis Based on Random Uncertainty and Fuzzy Uncertainty
    Wu, Xiaojun
    Wu, Jing
    COMPLEXITY, 2021, 2021
  • [9] Risk Priority Number for Bridge Failures
    Putcha, Chandrasekhar
    Dutta, Subhrajit
    Rodriguez, Jessica
    PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2020, 25 (02)
  • [10] Risk Priority Number vs Action Priority in Electrical Systems
    Petrescu, Lucian
    Petrescu, Maria-Catalina
    Cazacu, Emil
    Ionita, Valentin
    2021 12TH INTERNATIONAL SYMPOSIUM ON ADVANCED TOPICS IN ELECTRICAL ENGINEERING (ATEE), 2021,