共 50 条
- [1] Analysis and Improvement of the Risk Assessment System Based on the Risk Priority Number Russ. Eng. Res., 7 (1026-1029): : 1026 - 1029
- [3] Risk Analysis of Propulsion System based on Similarity Measure and Weighted Fuzzy Risk Priority Number in FMEA Yang, Yuan-Jian (hzhuang@uestc.edu.cn), 1600, De Gruyter Open Ltd (38): : 163 - 172
- [6] Action Selection Based on Fuzzy AHP-Based TOPSIS Method in Fuzzy FMEA-Based Risk Assessment: A Case Study INTELLIGENT AND FUZZY SYSTEMS: DIGITAL ACCELERATION AND THE NEW NORMAL, INFUS 2022, VOL 1, 2022, 504 : 369 - 377
- [7] Risk Assessment in a Parallel Production System with the Use of FMEA Method and Linguistic Variables COMPUTER INFORMATION SYSTEMS AND INDUSTRIAL MANAGEMENT (CISIM 2017), 2017, 10244 : 379 - 390
- [8] An improved risk priority number model for FMEA based on belief measure 2023 35TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC, 2023, : 3940 - 3945
- [10] Research on Sales Quality System Improvement Based on FMEA 2009 6TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1 AND 2, 2009, : 236 - 240