Cable-stayed bridge concept for longer spans

被引:5
|
作者
DSD Dillinger Stahlbau GmbH, Saarlouis, Germany [1 ]
机构
来源
Journal of Bridge Engineering | 1996年 / 1卷 / 03期
关键词
Costs - Dynamic loads - Structural analysis - Struts - Suspension bridges;
D O I
暂无
中图分类号
学科分类号
摘要
Achieving larger maximum spans by inventing new bridge systems has always been a fascinating intellectual challenge. Several concepts of modified cable-supported bridges have been proposed in the past that promise to surpass the more traditional cable-supported bridges in terms of maximum span length. Some of these concepts are recalled in this paper. An alternative concept derived from the classical cable-stayed bridge system is presented. Instead of vertical pylons, pairs of inclined pylon legs, spreading out longitudinally and connected at the top by horizontal ties, are used. The merits and shortcomings of such a system are discussed. Based on a comparative analysis of forces, quantities, and costs, it is concluded that the alternative concept presented in this paper not only allows the achievement of larger maximum spans, but also can lead to an economically advantageous design - even within the span-length range of the classical cable-stayed bridge system.
引用
收藏
页码:99 / 103
相关论文
共 50 条
  • [41] Global analysis of the SuTong cable-stayed bridge
    Miao, Jiawu
    Xiao, Rucheng
    Pei, Minshan
    Zhang, Xigang
    Pircher, Martin
    Janjic, Dorian
    IABSE Conference New Delhi, India 2005: ROLE OF STRUCTURAL ENGINEERS TOWARDS REDUCTION OF POVERTY, 2005, : 343 - 348
  • [42] Replacement of the stays on a major cable-stayed bridge
    Sandberg, J.
    Hendy, C. R.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2010, 163 (01) : 31 - 42
  • [43] CABLE-STAYED BRIDGE CROSSES THE MISSISSIPPI.
    Anon
    Welding Design and Fabrication, 1984, 57 (06): : 67 - 70
  • [44] The art of major bridge-building - Hellmut Homberg and his contribution to multiple cable-stayed spans
    Pelke, Eberhard
    Kurrer, Karl-Eugen
    STEEL CONSTRUCTION-DESIGN AND RESEARCH, 2012, 5 (04): : 251 - 265
  • [45] Optimal design of cable-stayed bridge and its approach spans under spatially varying ground motions
    Wen, Jianian
    Bi, Kaiming
    Xu, Li
    Sun, Dezhang
    Han, Qiang
    Du, Xiuli
    ENGINEERING STRUCTURES, 2023, 286
  • [46] Cable-stayed bridge over the Sangone creek
    Anon
    Industria Italiana del Cemento, 2006, 76 (820): : 472 - 475
  • [47] Dynamic study of the Barqueta cable-stayed bridge
    Escuela Superior de Ingenieros, Universidad de Sevilla, Camino de los Descubrimientos s/n, 41092 Seville, Spain
    Conf. Proc. Soc. Exp. Mech. Ser.,
  • [48] Dynamic tests on large cable-stayed bridge
    Cunha, A.
    Caetano, E.
    Delgado, R.
    Journal of Bridge Engineering, 2001, 6 (01) : 54 - 62
  • [49] Veering phenomena in cable-stayed bridge dynamics
    Gattulli, V.
    Nicolucci, L.
    Lepidi, M.
    Structural Dynamics - EURODYN 2005, Vols 1-3, 2005, : 1113 - 1118
  • [50] Cooperation of cable-stayed bridge with other bridges
    School of Civil and Hydraulic Engineering, Dalian University of Technology, Dalian 116023, China
    Wuhan Ligong Daxue Xuebao (Jiaotong Kexue Yu Gongcheng Ban), 2008, 2 (214-217):