共 50 条
- [31] CRITICAL ISSUES AND REQUIRED FACILITIES. [J]. Journal of Fusion Energy, 1985, 4 (2-3) : 133 - 138
- [32] UNDERWATER INSPECTION OF WATERFRONT FACILITIES. [J]. Military Engineer, 1986, 78 (509): : 442 - 445
- [33] Polypropylene: Focus on Installed Facilities. [J]. Revue generale du caoutchouc et des plastiques, 1984, 61 (637-638): : 33 - 38
- [36] Key parameters for the optimal layout of subsurface drainage pipe in arid areas [J]. Nongye Gongcheng Xuebao/Transactions of the Chinese Society of Agricultural Engineering, 2021, 37 (14): : 117 - 126
- [38] Modern steam power facilities. [J]. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1908, 52 : 735 - 740
- [39] COATING CONCRETE IN INDUSTRIAL FACILITIES. [J]. Journal of Protective Coatings and Linings, 1986, 3 (11): : 48 - 54
- [40] PROJECT DEVELOPMENT AND BUILDING FACILITIES. [J]. Telecommunication Journal of Australia, 1981, 31 (02) : 114 - 119