共 50 条
- [1] CALIFORNIA STATE WATER PROJECT - VOLUME II CONVEYANCE FACILITIES. [J]. Bulletin - California, Department of Water Resources, 1974, (200):
- [3] Newer measuring facilities. [J]. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1921, 65 : 451 - 452
- [4] PHYSICAL TESTING FACILITIES. [J]. RAPRA Members Journal (Rubber and Plastics Research Association of Great Britain), 1975, 3 (03): : 42 - 45
- [5] The modernisation of educational facilities. [J]. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1925, 69 : 664 - 671
- [6] Software validation facilities. [J]. DASIA '97 - DATA SYSTEMS IN AEROSPACE, 1997, 409 : 375 - 380
- [7] American foundry facilities. [J]. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1912, 56 : 1574 - 1578
- [8] LAYOUT OF PRODUCTION FACILITIES. [J]. Journal of Engineering Sciences, King Saud University, 1976, 2 (01): : 9 - 13
- [10] DEVELOPMENT OF ASEISMIC DESIGN OF PIPING, VESSELS AND EQUIPMENT IN NUCLEAR FACILITIES. [J]. Nuclear Engineering and Design, 1600, 2 (393-427):