CONTROLLING METRICATION COSTS IN A PRODUCTION FACILITY.

被引:0
|
作者
Medvedeff, Andre' S.
机构
关键词
PRODUCT DESIGN;
D O I
暂无
中图分类号
学科分类号
摘要
Introduction of a new product provided an opportunity to implement metrication cost controls in a production agency. Operational guidelines were developed, leading to the formation of a plant committee with defined metrication responsibilities. Cost control methods were devised. Identification of personnel affected, and equipment and training needs were made possible by extension of the process flow diagram concept.
引用
收藏
相关论文
共 50 条
  • [21] EMISSIONS CONTROL AND AMBIENT AIR QUALITY AT A SECONDARY STEEL PRODUCTION FACILITY.
    Stephens, N.Thomas
    Hughes, J.Martin
    Owen, Bruce W.
    1600,
  • [22] REVERSE OSMOSIS/DEIONIZED WATER BACTERIAL CONTROL AT THE CENTRAL PRODUCTION FACILITY.
    Martyak, John E.
    Microcontamination, 1988, 6 (01): : 34 - 37
  • [23] UNISOR ISOTOPE SEPARATOR FACILITY.
    Carter, H.K.
    IEEE Transactions on Nuclear Science, 1980, NS-28 (02) : 1481 - 1148
  • [24] DYNAMIC MODEL PREDICTS SLUGGING FLOW EFFECTS IN OFFSHORE PRODUCTION FACILITY.
    Mackay, D.C.
    1600, (85):
  • [25] LEGS DATA ACQUISITION FACILITY.
    LeVine, M.J.
    IEEE Transactions on Nuclear Science, 1985, NS-32 (04) : 1360 - 1362
  • [26] EXPERIMENTAL PROGRAM AT THE LOTUS FACILITY.
    Haldy, P.-A.
    Kumar A.
    Sahraoui, C.
    Azam, S.
    Ramakrishna, D.V.S.
    Schneeberger, J.-P.
    Tsang, F.
    Green, L.
    Fusion Technology, 1986, 10 (3 pt 2A): : 931 - 939
  • [27] Fens-light facility.
    Grix, W
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1912, 56 : 588 - 592
  • [28] MALTA SEAWATER RO FACILITY.
    Andrews, W.T.
    Bergman, R.A.
    1600, (60):
  • [29] Construction of the KNK II Facility.
    Marth, W.
    Mausbeck, H.
    Andrae, H.
    Brudermuelller, G.
    1978, 23 (03): : 118 - 122
  • [30] SITING A HAZARDOUS WASTE FACILITY.
    Kovacs, William L.
    Hazardous Substances, 1986, 1 (03): : 20 - 24