RECLAMATION OF OPENCUT SPOIL PILES.

被引:0
|
作者
Anon
机构
来源
| 1600年 / 68期
关键词
D O I
暂无
中图分类号
TD [矿业工程]; P61 [矿床学];
学科分类号
0709 ; 081803 ; 0819 ;
摘要
Utah Development Company is engaged in an extensive program to reclaim the spoil piles created at its four Central Queensland open cut coal mines. Adherence to those plans and full integration of the reclamation activities in the mining operation are the basis of a successful reclamation effort. This article outlines the program developed to meet the reclamation aims and not the detailed studies which have been undertaken, at successive stages, to determine the specific guidelines.
引用
收藏
相关论文
共 50 条
  • [1] Operative treatment of piles.
    不详
    LANCET, 1931, 1 : 598 - 599
  • [2] STEEL BEARING PILES.
    Waite, D.
    Consulting Engineer (London), 1975, 39 (07):
  • [3] EFFICIENCY OF GROUP OF PILES.
    Venkatanarayana, P.
    Ratnakumar, Manohar
    1600, (14):
  • [4] SKIN RESISTANCE OF TENSION PILES.
    Tejchman, A.
    1976, 1 . (02): : 573 - 576
  • [5] DYNAMIC CHARACTERISTICS OF TAPERED PILES.
    Ghosh, D.P.
    1600, (15):
  • [6] SETTLEMENT ANALYSIS OF DRIVEN PILES.
    Petrasovits, G.
    Acta Technica (Budapest), 1975, 80 (3-4): : 343 - 351
  • [7] SOIL IMPROVEMENT WITH GRANULAR PILES.
    Ranjan, Gopal
    Govind Rao, B.
    Indian geotechnical journal, 1987, 17 (02): : 103 - 120
  • [8] Selection of a System of Plane Piles.
    Hill, D.G.
    1600, (48): : 9 - 10
  • [9] Franki Underreamed Bored Piles.
    Wallays, Maurice
    Annales de l'Institut Technique du Batiment et des Travaux Publics, 1972, (300): : 129 - 163
  • [10] STRUCTURAL CAPACITY OF BENT PILES.
    Broms, Bengt B.
    Sjoberg, Sven-Gunnar
    Ingelsson, Ingvar
    Ground Engineering, 1986, 19 (03): : 25 - 26