RECLAMATION OF OPENCUT SPOIL PILES.

被引:0
|
作者
Anon
机构
来源
| 1600年 / 68期
关键词
D O I
暂无
中图分类号
TD [矿业工程]; P61 [矿床学];
学科分类号
0709 ; 081803 ; 0819 ;
摘要
Utah Development Company is engaged in an extensive program to reclaim the spoil piles created at its four Central Queensland open cut coal mines. Adherence to those plans and full integration of the reclamation activities in the mining operation are the basis of a successful reclamation effort. This article outlines the program developed to meet the reclamation aims and not the detailed studies which have been undertaken, at successive stages, to determine the specific guidelines.
引用
收藏
相关论文
共 50 条
  • [21] Speedy method of relieving the pain of piles.
    Carter, W
    LANCET, 1902, 1 : 121 - 121
  • [22] AXIAL UPLIFT CAPACITY OF INCLINED PILES.
    Chattopadhyay, B.C.
    Pise, P.J.
    1600, (16):
  • [23] DRAINAGE PILES: A METHOD FOR INCREASING THE AXIAL CAPACITY OF FRICTION PILES.
    Kinra, R.K.
    Luque, R.F.
    van Daalen, F.
    1972, : 839 - 852
  • [24] STRUCTURAL RESTRAINT PROVIDED BY EMBEDDED PILES.
    Niall, Robert M.
    Institution of Engineers, Australia, Civil Engineering Transactions, 1985, CE27 (02): : 192 - 199
  • [25] Crack Formations in Reinforced or Prestressed Concrete Piles.
    Zorn, Nils F.
    Reinhardt, H.W.
    Bauingenieur Berlin, 1985, 60 (12): : 513 - 518
  • [26] PREDICTION OF LATERAL MOVEMENT OF BRIDGE ABUTMENTS ON PILES.
    Siriwardane, H.J.
    Moulton, L.K.
    Chen, Ran-Jay
    Transportation Research Record, 1984, : 14 - 24
  • [27] Dimensioning and Reinforcement of Large Bared Piles.
    Ulrichs, Karl R.
    1600, (15):
  • [28] WATER INTAKE IS CARVED OUT BETWEEN PILES.
    Anon
    1600, (197):
  • [29] Homogenization of Bulk Material in Blending Piles.
    Gerstel, A.W.
    Zement-Kalk-Gips, 1980, 33 (08): : 383 - 403
  • [30] ANALYSIS OF RESIDUAL STRESS EFFECTS IN PILES.
    Poulos, H.G.
    Journal of geotechnical engineering, 1987, 113 (03): : 216 - 229