共 50 条
- [31] Actions and control of CST blast furnace No. 2 hearth [J]. REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 2005, 102 (03): : 183 - 188
- [32] Burden distribution studies for Gary No. 4 blast furnace [J]. 60TH IRONMAKING CONFERENCE PROCEEDINGS, 2001, 60 : 57 - 69
- [34] Interim repair of the Lake Erie works' No. blast furnace [J]. Iron and Steel Engineer, 1990, 67 (06):
- [35] Relining and enlargement of Rogesa No. 4 blast furnace in 2003 [J]. REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 2005, 102 (7-8): : 517 - 524
- [37] COMPUTER CONTROL OF INLANDS NO 5 BLAST FURNACE [J]. BLAST FURNACE AND STEEL PLANT, 1967, 55 (12): : 1090 - &
- [38] No 5 Blast Furnace 1995 reline & upgrade [J]. 55TH IRONMAKING CONFERENCE PROCEEDINGS, 1996, 55 : 181 - 182
- [39] PROCESS CONTROL SYSTEM OF KOKURA No. 2 BLAST FURNACE. [J]. Kang T'ieh/Iron and Steel (Peking), 1985, 20 (11): : 64 - 68
- [40] Short term revamping of No. 6 blast furnace in Chiba Works [J]. REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 1999, 96 (03): : 349 - 357