共 50 条
- [3] Actions and control of CST blast furnace No. 2 hearth REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 2005, 102 (03): : 183 - 188
- [4] ASSESSING INFLUENCE OF TIMES OFF-BLAST ON BLAST-FURNACE PRODUCTIVITY STEEL IN THE USSR, 1983, 13 (01): : 4 - 6
- [5] PROCESS CONTROL SYSTEM OF KOKURA No. 2 BLAST FURNACE. Kang T'ieh/Iron and Steel (Peking), 1985, 20 (11): : 64 - 68
- [6] Construction of No. 6 blast furnace for BHP steel Iron and Steel Engineer, 1998, 75 (01): : 29 - 33
- [7] Modernization and reline of Hoogovens' No. 7 blast furnace Iron and Steel Engineer, 1994, 71 (10): : 29 - 36
- [8] Stabilization and performance of the No. 4 blast furnace bosh AISE Steel Technology, 2003, 80 (05): : 60 - 66
- [9] The hot test study on the stave of Baosteel's No. 3 Blast Furnace 58TH IRONMAKING CONFERENCE PROCEEDINGS, 1999, 58 : 99 - 102
- [10] Requirements for a 20 year campaign at Dofasco's No. 4 blast furnace AISE Steel Technology, 2001, 78 (01): : 58 - 62