GUATEMALA'S CHIXOY HYDROELECTRIC SCHEME.

被引:0
|
作者
Gysel, M. [1 ]
Lommatzsch, M. [1 ]
机构
[1] Motor Columbus Consulting Engineers, Inc, Baden, Switz, Motor Columbus Consulting Engineers Inc, Baden, Switz
来源
关键词
DAMS; EMBANKMENT - ELECTRIC LINES - ELECTRIC POWER TRANSMISSION;
D O I
暂无
中图分类号
学科分类号
摘要
Chixoy, the largest hydropower plant in Guatemala, began commercial operation in April 1986. The plant adds 300 MW to the interconnected grid system. This month, the first in a series of three articles presents general information about the US 900 million scheme.
引用
收藏
页码:15 / 18
相关论文
共 50 条
  • [31] WATER MANAGEMENT IN THE GEZIRA SCHEME.
    Levine, Gilbert
    Bailey, Charles
    International Journal of Water Resources Development, 1987, 3 (02) : 115 - 126
  • [32] Oxford Contributory Hospital Scheme.
    Collier, W
    LANCET, 1923, 1 : 616 - 617
  • [33] SBD GUARD RING SCHEME.
    Beyer, K.D.
    Reith, T.M.
    IBM technical disclosure bulletin, 1983, 25 (12):
  • [34] STABILITY OF A GENERAL PREISSMANN SCHEME.
    Lyn, Dennis A.
    Goodwin, Peter
    Journal of Hydraulic Engineering, 1987, 113 (01) : 16 - 28
  • [35] EXPERIMENTS WITH A PARALLEL COMMUNICATION SCHEME.
    Valiant, L.G.
    Proceedings - Annual Allerton Conference on Communication, Control, and Computing, 1980, : 802 - 811
  • [36] HADDINGTON FLOOD WARNING SCHEME.
    Sargent, R.J.
    Journal of the Institution of Water Engineers and Scientists, 1984, 38 (02): : 108 - 118
  • [37] The Manchester Medical Guild Scheme.
    Weir, AM
    BRITISH MEDICAL JOURNAL, 1901, 1901 : 839 - 839
  • [38] A country venereal diseases scheme.
    Butterworth, JJ
    LANCET, 1924, 1 : 1339 - 1339
  • [39] CHINA'S FIRST WORLD BANK-ASSISTED HYDRO SCHEME.
    Cheng Xuemin
    International Water Power and Dam Construction, 1986, 38 (02): : 41 - 44
  • [40] NEW ADAPTIVE DELTA MODULATOR SCHEME.
    Kak, S.K.
    Mohan, Anand
    Journal of the Institution of Engineers. India. Electronics and telecommunication engineering division, 1986, 66 (pt 4): : 67 - 69