Chixoy, the largest hydropower plant in Guatemala, began commercial operation in April 1986. The plant adds 300 MW to the interconnected grid system. This month, the first in a series of three articles presents general information about the US 900 million scheme.
引用
收藏
页码:15 / 18
相关论文
共 50 条
  • [21] MARGINAL GAS PRODUCTION SCHEME.
    Anon
    Ocean industry, 1981, 16 (10):
  • [22] MEB TOTAL ENERGY SCHEME.
    Hepwood, W.F.
    1978, 7 (05): : 21 - 23
  • [23] EXPERIMENTS WITH A COMPRESSED FORECAT SCHEME.
    Zakhariev, V.
    Losev, V.M.
    Prodanova, M.
    Kadyshnikov, V.M.
    1600,
  • [24] ONEWA ROAD PRIORITY SCHEME.
    Rutherford, Ross P.
    Houghton, D.G.
    1600, (12):
  • [25] A county venereal diseases scheme.
    Halliburton, WD
    LANCET, 1924, 1 : 1184 - 1184
  • [26] A private-hospital scheme.
    不详
    BRITISH MEDICAL JOURNAL, 1927, 1927 : 347 - 348
  • [27] The tensive scheme. Synthesis and proposals
    Hebert, Louis
    TANGENCE, 2005, (79): : 111 - 139
  • [28] MODELING NEURAL NETWORKS IN SCHEME.
    Eilbert, James L.
    Salter, Richard M.
    1600, (46):
  • [29] Entropy inequalities for a relaxation scheme.
    Berthon, C
    COMPTES RENDUS MATHEMATIQUE, 2005, 340 (01) : 63 - 68
  • [30] MEB TOTAL ENERGY SCHEME.
    Shepherd, G.T.
    Energy Digest, 1979, 8 (02): : 13 - 15