共 50 条
- [21] SEGMENTAL BRIDGE CONSTRUCTION IN FLORIDA - A REVIEW AND PERSPECTIVE PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1990, 88 : 381 - 419
- [23] Analysis of variability of the long-term deflection of a new kind of composite bridge deck ADVANCES IN STRUCTURES, VOLS 1 AND 2, 2003, : 825 - 831
- [24] STUDY ON THE KEY TECHNOLOGY OF LONG-SPAN BRIDGE CONSTRUCTION IN MARINE ENVIRONMENT FRESENIUS ENVIRONMENTAL BULLETIN, 2022, 31 (10): : 9977 - 9987
- [25] Change the bridge deck construction stress data contrast analysis ISTM/2003: 5TH INTERNATIONAL SYMPOSIUM ON TEST AND MEASUREMENT, VOLS 1-6, CONFERENCE PROCEEDINGS, 2003, : 485 - 487
- [26] Brief Discussion on Design and Construction of Concrete Bridge Deck Surfacing PROCEEDINGS OF SHANGHAI INTERNATIONAL CONFERENCE ON TECHNOLOGY OF ARCHITECTURE AND STRUCTURE, PT II, 2009, : 472 - 477
- [30] Effects of construction time and coarse aggregate on bridge deck cracking ACI Mater J, 2009, 5 (448-454):