Application of computer simulation to bridge deck construction: Case study

被引:19
|
作者
Said, H. [1 ]
Marzouk, M. [1 ]
El-Said, M. [1 ]
机构
[1] Cairo Univ, Fac Engn, Dept Struct Engn, Giza 12211, Egypt
关键词
Cast-in-place on falsework construction; Cantilever carriage construction; Computer simulation; Case study; MODEL;
D O I
10.1016/j.autcon.2008.11.004
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Bridge deck construction is performed in a cyclic manner and it involves different types of interacted resources. This paper presents a case study that discusses how computer simulation is used to aid bridges' contractors in planning of bridges' decks. taking into consideration the interaction amongst involved resources. As such, total duration of deck execution and the associated total costs, including direct and indirect costs, can be estimated. El-Warrak Bridge, which is a part of the Ring Road of Cairo, Egypt. is analyzed in a step-by-step procedure to demonstrate the capability of computer simulation in modeling construction of bridges' decks using cast-in-place on falsework and cantilever carriage construction methods. The presented methodology proves its practicality to contractors in estimating the time and costs of the repetitive process of bridge deck construction, considering complex interdependencies between construction resources and the uncertainties associated with construction activities. (c) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:377 / 385
页数:9
相关论文
共 50 条
  • [1] Simulation study on construction process of FRP bridge deck panels
    Hong, Taehoon
    Hastak, Makarand
    [J]. AUTOMATION IN CONSTRUCTION, 2007, 16 (05) : 620 - 631
  • [2] BRIGE_SIM: Framework for planning and optimizing bridge deck construction using computer simulation
    Marzouk, Mohamed
    Zein, Hisham
    Elsaid, Moheeb
    [J]. PROCEEDINGS OF THE 2006 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2006, : 2039 - +
  • [3] Investigation on materials for prefabricated bridge deck pavement and construction technology: Application to a case study of concrete box-girder bridge
    Liu, Yang
    Qian, Zhen-Dong
    Xie, Yu-Xin
    Xu, Shi-Qiao
    [J]. CASE STUDIES IN CONSTRUCTION MATERIALS, 2024, 20
  • [4] Educational Model Based on Virtual Reality Simulation of the Construction of a Bridge Deck
    Sampaio, Alcinia Z.
    Viana, Luis
    [J]. 2013 2ND EXPERIMENT@ INTERNATIONAL CONFERENCE (EXP.AT'13), 2013, : 52 - 57
  • [5] COMPUTER MODELING OF BRIDGE DECK CRACKING
    Li, Lianfang
    Berke, Neal S.
    Durning, Timothy A.
    [J]. ADVANCES IN CONCRETE STRUCTURAL DURABILITY, PROCEEDINGS OF ICDCS2008, VOLS 1 AND 2, 2008, : 790 - 795
  • [6] Double-layer prefabricated FRP grids for rapid bridge deck construction: case study
    Bank, LC
    Oliva, MG
    Russell, JS
    Jacobson, DA
    Conachen, M
    Nelson, B
    McMonigal, D
    [J]. JOURNAL OF COMPOSITES FOR CONSTRUCTION, 2006, 10 (03) : 204 - 212
  • [7] Design and construction of open deck bridge
    Abo, T.
    Ooba, M.
    Yoda, S.
    Suzuki, S.
    [J]. TAILOR MADE CONCRETE STRUCTURES: NEW SOLUTIONS FOR OUR SOCIETY, 2008, : 162 - 162
  • [8] A computer simulation of the construction of the Alamillo bridge in Seville, Spain
    López, RAY
    Halpin, DW
    [J]. CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 121 - 126
  • [9] Virtual Reality Used as a Learning Technology: Visual Simulation of the Construction of a Bridge Deck
    Zita Sampaio, A.
    Viana, Luis
    [J]. PROCEEDINGS OF THE 2013 8TH IBERIAN CONFERENCE ON INFORMATION SYSTEMS AND TECHNOLOGIES (CISTI 2013), 2013,
  • [10] Resource management of bridge deck rehabilitation: Jacques Cartier bridge case study
    Zhang, Cheng
    Zayed, Tarek
    Hammad, Amin
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (05) : 311 - 319