A two-unit parallel redundant repairable electronic system with exponential failure-time distribution and overloading effect is considered. The system is to be in any of three states: good, degraded and failed. One repair facility is available when the system is either in degraded or failed state. The repair for the system in any state follows a general distribution. To make the system more applicable to practical life problems, time dependent probabilities have been evaluated so as to forecast the expected profit and operational availability of the system at any time. Using supplementary variable technique, Laplace transforms of various state probabilities have been evaluated. Making use of Abel's theorem, various time independent probabilities have been computed. The overloading effect for the expected profit on the operational availability of the complex system has been studied.
引用
收藏
页码:847 / 851
相关论文
共 50 条
  • [21] COST-BENEFIT ANALYSIS OF A TWO-UNIT DETERIORATING STANDBY SYSTEM WITH DETECTOR.
    Goel, L.R.
    Sharma, G.C.
    Gupta, Praveen
    1600, (26):
  • [22] Probabilistic analysis of a two-unit cold standby redundant system subject to failure of controlled weather device
    Mahmoud, M.A.W.
    Moshref, M.E.
    Microelectronics Reliability, 1997, 37 (04): : 623 - 628
  • [23] Cost analysis of a two-unit cold standby system subject to degradation, inspection and priority
    Kumar, Jitender
    Kadyan, Mukender Singh
    Malik, Suresh Chander
    Eksploatacja i Niezawodnosc, 2012, 14 (04) : 278 - 283
  • [24] COST ANALYSIS OF A TWO-UNIT COLD STANDBY SYSTEM SUBJECT TO DEGRADATION, INSPECTION AND PRIORITY
    Kumar, Jitender
    Kadyan, Mukender Singh
    Malik, Suresh Chander
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2012, 14 (04): : 278 - 283
  • [25] Two-Unit Redundant System with Detection Delay and Imperfect Coverage: Confidence Interval Estimation
    Ke, Jau-Chuan
    Lee, Ssu-Lang
    Ko, Ming-Yang
    QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2011, 8 (01): : 1 - 14
  • [26] Stochastic Behavior of a Two-Unit Cold Standby Redundant System Under Poisson Shocks
    El-Sherbeny, Mohamed Salah
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2017, 42 (07) : 3043 - 3053
  • [27] Time-Dependent Analysis for a Two-Unit System with Connecting and Disconnecting Effect
    Mijit, Alim
    GAZI UNIVERSITY JOURNAL OF SCIENCE, 2015, 28 (01): : 27 - 35
  • [28] Stochastic Behavior of a Two-Unit Cold Standby Redundant System Under Poisson Shocks
    Mohamed Salah El-Sherbeny
    Arabian Journal for Science and Engineering, 2017, 42 : 3043 - 3053
  • [29] RELIABILITY AND SAFETY FACTOR OF TWO-UNIT REDUNDANT SYSTEMS.
    Gopalan, M.N.
    Venkateswarlu, P.
    Reliability engineering, 1986, 14 (03): : 183 - 192
  • [30] Stochastic behavior of a two-unit cold standby redundant system subject to random failure
    Hyderi, PD
    Joorel, JPS
    MICROELECTRONICS AND RELIABILITY, 1996, 36 (02): : 243 - 246