共 50 条
- [41] PRODUCTION PLANNING AND OPTIMIZATION MODEL FOR AN ALUMINIUM SMELTER FOUNDRY. Aluminium (English Edition), 1983, 59 (07):
- [42] OUTLINE REQUIREMENTS FOR A PRODUCTION PLANNING AND CONTROL SYSTEM FOR A FOUNDRY. Foundryman, 1983, 76 (pt 4): : 56 - 59
- [43] SUCCESSFUL CHANNEL INJECTION SYSTEM AT EAST MIDLANDS ALUMINIUM FOUNDRY. Foundry Trade Journal, 1975, 138 (3039):
- [44] HIGH-PRESSURE-SQUEEZE MOULDING MACHINES AND THEIR PLACE IN THE MODERN FOUNDRY. Foundry Trade Journal, 1972, 133 (2920):
- [45] Energy Savings in an Aluminum Pressure Die-Casting Foundry. Termotecnica Milano, 1982, 37 (10): : 81 - 87
- [46] Use of a Nondestructive Testing Method for Quality Control in a Light Metal Foundry. Giessereitechnik, 1973, 19 (06): : 183 - 187
- [47] Guide lines for the delivery of cast iron, drawn up by the German foundry. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1905, 49 : 404 - 409
- [49] $PND#300,000 investment in electric melting for new foundry. Successful field trials lead to new product development Foundryman, 1994, 87 (pt 6):
- [50] TEN YEARS' EXPERIENCE OF UMCo-TYPE ALLOYS IN A SPECIAL STEEL FOUNDRY. Foundry Trade Journal, 1974, 136 (2988): : 289 - 294