共 50 条
- [1] PRODUCTION PLANNING AND OPTIMIZATION MODEL FOR AN ALUMINIUM SMELTER FOUNDRY. Aluminium (English Edition), 1983, 59 (07):
- [4] OUTLINE REQUIREMENTS FOR A PRODUCTION PLANNING AND CONTROL SYSTEM FOR A FOUNDRY. Foundryman, 1983, 76 (pt 4): : 56 - 59
- [7] $PND#300,000 investment in electric melting for new foundry. Successful field trials lead to new product development Foundryman, 1994, 87 (pt 6):
- [9] NATIONAL CENTRAL LIBRARY AND EAST MIDLANDS REGIONAL LIBRARY SYSTEM JOURNAL OF LIBRARIANSHIP, 1970, 2 (04): : 263 - 271
- [10] Hongkong aluminium foundry adopts energy-saving Hotwork burner system Aluminium (Dusseldorf), 72 (04):