BOILER STEELS FOR HIGH-CAPACITY GENERATING UNITS.

被引:0
|
作者
Lanskaya, K.A.
机构
关键词
STEEL TESTING;
D O I
暂无
中图分类号
学科分类号
摘要
Problems of manufacturing heat-resistant and corrosion-resistant boiler steels are outlined and individual steel grades are considered. The ways to decrease non-metallic inclusions and residual concentrations of undesirable elements and the tests on new types of alloys are discussed.
引用
下载
收藏
页码:45 / 49
相关论文
共 50 条
  • [41] ON-LINE EFFICIENCY MONITORING OF HYDROELECTRIC GENERATING UNITS.
    Streat, J.
    MacDonald, J.A.
    Johnson, R.E.
    National Engineer, 1983, 87 (12): : 18 - 22
  • [42] SIMULATION AND INVESTIGATION OF THE COOLING PROCESSES OF HIGH-CAPACITY TURBINE UNITS
    PEREVERZEV, DA
    KOSTRYKIN, VA
    PALEI, VA
    THERMAL ENGINEERING, 1980, 27 (09) : 509 - 512
  • [43] Determination of a Dynamic Model of Electricity-Generating Units.
    Roelofs, G.P.T.
    Elektrotechniek, 1985, 63 (03): : 281 - 289
  • [44] Erection of the Steam-Generating Plant of Two Units.
    Grgic, Anto
    1600, (27):
  • [45] SOME ASPECTS OF OPTIMAL MAINTENANCE SCHEDULING OF GENERATING UNITS.
    Kothari, D.P.
    Girotra, S.N.
    Yadava, G.S.
    Journal of the Institution of Engineers (India): Electrical Engineering Division, 1985, 66 : 41 - 45
  • [46] INFLUENCE OF GAS RECIRCULATION ON OPERATIONAL RELIABILITY OF SUPERHEATER OF A HIGH-CAPACITY SUPERCRITICAL BOILER
    REZNIK, NI
    THERMAL ENGINEERING, 1973, 20 (02) : 49 - 52
  • [47] High-capacity
    Bulk Solid Handl, 2008, 1 (34-35): : 34 - 35
  • [48] STEELS FOR TUBES OF VERY EFFICIENT HIGH-CAPACITY STEAM-GENERATORS
    ANTIKAIN, PA
    ZUSMAN, VM
    GASHO, TV
    GREBENNIKOVA, TT
    MIKULINA, YD
    SAMARETS, GN
    TIKHONOVA, VV
    THERMAL ENGINEERING, 1976, 23 (10) : 17 - 20
  • [49] Specifics of Electromagnetic and Electromechanical Processes for Starting Up Forced-Draft Systems of High-Capacity TPP Power Generating Units
    Dovganyuk I.Y.
    Sokur P.V.
    Lazarev G.B.
    Power Technology and Engineering, 2021, 54 (06) : 904 - 914
  • [50] START-UP PROCEDURES FOR HIGH CAPACITY BOILER/TURBINE UNITS
    SHMUKLER, BI
    THERMAL ENGINEERING, 1972, 18 (07) : 29 - &