GEBEIT GOLD MINE.

被引:0
|
作者
Shaw, Andy
机构
来源
Mining Magazine | 1988年 / 158卷 / 05期
关键词
GEOLOGY - Sudan - GOLD ORE TREATMENT - Flotation;
D O I
暂无
中图分类号
学科分类号
摘要
Greenwich Resources has re-established gold mining operations at Gebeit, 220km north-west of Port Sudan. Gebeit was worked intermittently until 1975 and records suggest that around 4. 3 t (140,000 oz) of gold may have been extracted from the high grade lodes over this time. However, the depth of mining was restricted by ventilation problems and the full potential of the gold-bearing horizons was never realized. The article covers geology, mining and milling operations.
引用
收藏
页码:376 / 377
相关论文
共 50 条
  • [21] This Duchess of Mine.
    Ramsdell, Kristin
    LIBRARY JOURNAL, 2009, 134 (11) : 57 - 57
  • [22] BEATING THE CLOCK AND BUDGET AT CANADA'S LARGEST GOLD MINE.
    Knoll, Kerry
    1600, (105):
  • [23] HANAOKA MINE.
    Anon
    Mining Magazine, 1984, 151 (05): : 414 - 423
  • [24] HOSOKURA MINE.
    Saga, Yohsuke
    1984, (100):
  • [25] AKENOBE MINE.
    Sakurai, Sakae
    Kawakami, Hiroshi
    Nihon Kogyokaishi, 1984, 100 (1160): : 948 - 953
  • [26] POLARIS MINE.
    Anon
    Mining Magazine, 1982, 147 (03): : 180 - 193
  • [27] The schuyler mine.
    Granbery, JH
    JOURNAL OF THE FRANKLIN INSTITUTE, 1907, 164 : 0013 - +
  • [28] MAMUT MINE.
    Fumoto, Naotaka
    1600, (100):
  • [29] YATANI MINE.
    Tashiro, Makoto
    1984, (100):
  • [30] TSUKINUNO MINE.
    Yamaya, Kinji
    1984, (100):