Resettlement issues of Cirata Dam project: A post-project review

被引:0
|
作者
Nakayama, Mikiyasu [1 ]
Gunawan, Budhi [2 ]
Yoshida, Tsuneaki [3 ]
Asaeda, Takashi [4 ]
机构
[1] U. Grad. Sch. of Agric. Science, Tokyo Univ. of Agric. and Technology, 3-5-8 Saiwai-cho, Fuchitit-city, Tokyo 183-8509, Japan
[2] Institute of Ecology, Padjadjaran University, Jl. Sekeloa Selatan No.1, Bandung 40132, Indonesia
[3] Graduate School of Engineering, University of Tokyo, 7-3-1 Hongo, Bunkyo-ku, Tokyo 113-8656, Japan
[4] Grad. Sch. of Sci. and Engineering, University of Snitama, 255 Simo-Ohkubo, Urawa, Saitama 338-0825, Japan
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:443 / 458
相关论文
共 50 条
  • [41] Lessons Learned and Post-Project Activities with Embedded Engineering Learning Platform
    Kastelan, Ivan
    Temerinac, Miodrag
    PROCEEDINGS OF 2017 IEEE GLOBAL ENGINEERING EDUCATION CONFERENCE (EDUCON2017), 2017, : 1125 - 1128
  • [42] VOLTA RESETTLEMENT PROJECT
    HILTON, TE
    JOURNAL OF TROPICAL GEOGRAPHY, 1967, 24 (JUN): : 12 - 21
  • [43] Study of Intelligent Integrated Modeling and Development of Agricultural Post-Project Evaluation
    Li, Chen
    COMPUTER AND COMPUTING TECHNOLOGIES IN AGRICULTURE IV, PT 3, 2011, 346 : 549 - 553
  • [44] A comparative study of stress between pre- and post-Project 2000 students
    Lindop, E
    JOURNAL OF ADVANCED NURSING, 1999, 29 (04) : 967 - 973
  • [45] In the Land of the Dammed: Assessing Governance in Resettlement of Ghana's Bui Dam Project
    Asiama, Kwabena
    Lengoiboni, Monica
    van der Molen, Paul
    LAND, 2017, 6 (04)
  • [46] The resettlement programme of the Wonorejo Dam project in Tulungagung, Indonesia: the perceptions of former residents
    Sisinggih, Dian
    Wahyuni, Sri
    Juwono, Pitojo Tri
    INTERNATIONAL JOURNAL OF WATER RESOURCES DEVELOPMENT, 2013, 29 (01) : 14 - 24
  • [47] The Tehri Dam Project and issues of population, development, and environment
    Bose, A
    POPULATION, ENVIRONMENT, AND DEVELOPMENT, 1997, : 229 - 248
  • [48] GLOBAL NETWORKS: ISSUES AND TACTICS IN THE BAKUN DAM PROJECT
    Khalid, Kartini Aboo Talib
    JEBAT-MALAYSIAN JOURNAL OF HISTORY POLITICS AND STRATEGIC STUDIES, 2007, 34 : 1 - 16
  • [49] Effect of the Lower Kihansi Hydropower Project and post-project mitigation measures on wetland vegetation in Kihansi Gorge, Tanzania
    C.H. Quinn
    H.J. Ndangalasi
    J. Gerstle
    J.C. Lovett
    Biodiversity & Conservation, 2005, 14 : 297 - 308
  • [50] Effect of the Lower Kihansi Hydropower Project and post-project mitigation measures on wetland vegetation in Kihansi Gorge, Tanzania
    Quinn, CH
    Ndangalasi, HJ
    Gerstle, J
    Lovett, JC
    BIODIVERSITY AND CONSERVATION, 2005, 14 (02) : 297 - 308