Resettlement issues of Cirata Dam project: A post-project review

被引:0
|
作者
Nakayama, Mikiyasu [1 ]
Gunawan, Budhi [2 ]
Yoshida, Tsuneaki [3 ]
Asaeda, Takashi [4 ]
机构
[1] U. Grad. Sch. of Agric. Science, Tokyo Univ. of Agric. and Technology, 3-5-8 Saiwai-cho, Fuchitit-city, Tokyo 183-8509, Japan
[2] Institute of Ecology, Padjadjaran University, Jl. Sekeloa Selatan No.1, Bandung 40132, Indonesia
[3] Graduate School of Engineering, University of Tokyo, 7-3-1 Hongo, Bunkyo-ku, Tokyo 113-8656, Japan
[4] Grad. Sch. of Sci. and Engineering, University of Snitama, 255 Simo-Ohkubo, Urawa, Saitama 338-0825, Japan
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:443 / 458
相关论文
共 50 条
  • [21] 7 POINTS FOR THE POST-PROJECT APPROACH + THE SO-CALLED SPECIAL PROJECT
    PURINI, F
    LOTUS INTERNATIONAL, 1991, 69 : 125 - 127
  • [22] Post-Project Market Review as a Tool for Stimulating Commercialisation of Knowledge Creation Projects
    Bout, Liesbeth Y.
    Lombaers, Jaap H. M.
    Constantinides, Efthymios
    de Weerd-Nederhof, Petra C.
    NEW TECHNOLOGY-BASED FIRMS IN THE NEW MILLENNIUM, VOL 7: PRODUCTION AND DISTRIBUTION OF KNOWLEDGE, 2009, 7 : 89 - 101
  • [23] Mandated monitoring of post-project impacts in the Czech EIA
    Branis, M
    Christopoulos, S
    ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2005, 25 (03) : 227 - 238
  • [24] Post-project evaluation of the sustainability of development project outcomes: a case study in eastern Indonesia
    Myers, Bronwyn
    Fisher, Rohan
    Pickering, Sam
    Garnett, Stephen
    DEVELOPMENT IN PRACTICE, 2014, 24 (03) : 379 - 389
  • [25] Post-project geomorphic assessment of a large process-based river restoration project
    Erwin, Susannah O.
    Schmidt, John C.
    Allred, Tyler M.
    GEOMORPHOLOGY, 2016, 270 : 145 - 158
  • [26] From Preamble to Post-project Frustrations: The Shaping of a Slum Upgrading Project in Recife, Brazil
    Koster, Martijn
    Nuijten, Monique
    ANTIPODE, 2012, 44 (01) : 175 - 196
  • [28] Post-project appraisals in adaptive management of river channel restoration
    Downs, PW
    Kondolf, GM
    ENVIRONMENTAL MANAGEMENT, 2002, 29 (04) : 477 - 496
  • [29] Post-Project Appraisals in Adaptive Management of River Channel Restoration
    PETER W. DOWNS
    G. MATHIAS KONDOLF
    Environmental Management, 2002, 29 : 477 - 496
  • [30] Post-Project Appraisals of River Restoration in Advanced University Instruction
    Kondolf, G. M.
    Anderson, Shannah D.
    Storesund, Rune
    Tompkins, Mark
    Atwood, Paul
    RESTORATION ECOLOGY, 2011, 19 (06) : 696 - 700