DECENTRALISED SCHEDULING.

被引:0
|
作者
Casey, L.M.
机构
来源
Australian Computer Journal | 1981年 / 13卷 / 02期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Multicomputer systems, including networks, that are going to realize their full potential for fault tolerance combined with cost effectiveness will need to employ decentralized control. In particular scheduling decisions will have to be decentralized decisions. Mechanisms that have been proposed for decentralized scheduling are surveyed. Details (including some simulation results) are given for a distributed load balancing scheme that employs latest reported status. This scheme minimizes bandwidth requirements, while evenly spreading the work load.
引用
收藏
页码:58 / 63
相关论文
共 50 条
  • [41] TWO-STEP OPTIMAL THERMAL GENERATION SCHEDULING.
    Fardanesh, B.
    Villaseca, F.E.
    1600, (22):
  • [42] DYNAMIC MODELLING OF JOB-SHOP PRODUCTION SCHEDULING.
    Andrei, Neculai
    1600, (12):
  • [43] A novel core stateless virtual clock scheduling. algorithm
    Gao, WY
    Wang, JX
    Chen, SQ
    NETWORKING AND MOBILE COMPUTING, PROCEEDINGS, 2005, 3619 : 662 - 671
  • [44] EARTH SURFACE SURVEY BY A SATELLITE: SURVEY PROCESS SCHEDULING.
    Malyshev, V.V.
    Moiseev, D.V.
    1600, (02):
  • [45] Domain-specific shell for scheduling. PLANBOX/SCH
    Kawasaki, Yoji
    Tanimoto, Kazutaka
    NEC Research and Development, 1991, 32 (02): : 270 - 276
  • [46] THEORETICAL JUSTIFICATION FOR THE USE OF 'JUST-IN-TIME' SCHEDULING.
    Haynsworth, Hugh C.
    Production & Inventory Management, 1984, 25 (01): : 1 - 3
  • [47] Three dimensional Bin Packing Problem in batch scheduling.
    Koblasa, Frantisek
    Vavrousek, Miroslav
    Manlig, Frantisek
    34TH INTERNATIONAL CONFERENCE MATHEMATICAL METHODS IN ECONOMICS (MME 2016), 2016, : 407 - 412
  • [48] Use of Petri nets for virtual prototyping project scheduling.
    Shi, GQ
    Li, BH
    Chai, XD
    System Simulation and Scientific Computing, Vols 1 and 2, Proceedings, 2005, : 13 - 17
  • [49] SIMPLIFIED APPROACH TO SOLUTION OF COORDINATION EQUATION FOR GENERATION SCHEDULING.
    Palanichamy, C.
    Srikrishna, K.
    Journal of the Institution of Engineers (India): Electrical Engineering Division, 1987, 67 : 254 - 257
  • [50] MONITORING COIL WINDING EQUIPMENT USAGE FOR PRODUCTION SCHEDULING.
    Leland, Bruce C.
    Electri-onics, 1983, 29 (10): : 67 - 69