共 50 条
- [32] COMPUTER DRAFTING SAVES DRAWING TIME, CUTS COSTS. Civil Engineering (New York), 1974, 44 (02): : 48 - 52
- [33] CONTRACTOR'S ″PIPE ENVELOPE″ CUTS SUBWAY COSTS. Engineering and Contract Record, 1979, 92 (03): : 14 - 15
- [35] WATER BLADE JET COOLS QUICKLY, CUTS COSTS. Iron and steel international, 1981, 54 (04): : 193 - 197
- [38] NEW CONCEPT CUTS NUCLEAR PROJECT CONSTRUCTION COSTS. Power Engineering (Barrington, Illinois), 1987, 91 (11): : 28 - 31