SMALL-PROFILE METRO CUTS CONSTRUCTION COSTS.

被引:0
|
作者
Anon
机构
关键词
LOW-COST SUBWAY CONSTRUCTION - NARROW-GAUGE SUBWAY LINES - SMALL-PROFILE TUNNELS;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:295 / 297
相关论文
共 50 条
  • [1] NEW CONCEPT CUTS NUCLEAR PROJECT CONSTRUCTION COSTS.
    Clarey, James J.
    Power Engineering (Barrington, Illinois), 1987, 91 (11): : 28 - 31
  • [2] DECONTAMINATION CUTS COSTS.
    Know, Richard
    1983, (28):
  • [3] CENTRALIZED PRECASTING CUTS COSTS.
    Anon
    Engineering news-record, 1980, 204 (26): : 26 - 27
  • [4] EFFICIENT LOGGING CUTS COSTS.
    Gundersby, Per
    Lonner, Goran
    PPI Pulp and Paper International, 1977, 19 (05): : 56 - 57
  • [5] PUNCHING CUTS HOLEMAKING COSTS.
    Anon
    Tooling & Production, 1975, 41 (09): : 54 - 55
  • [6] SUPERABRASIVE CUTS HONING COSTS.
    Amos, A.
    Barnea, B.
    American machinist, 1983, 127 (01): : 107 - 109
  • [7] CUSTOM LATHE CUTS COSTS.
    SCHNEIDER, ROY
    1982, V 126 (N 11): : 133 - 134
  • [8] DESIGN FLEXIBILITY CUTS COSTS.
    Blunk, Reynold J.
    Civil engineering New York, N.Y., 1985, 55 (01): : 57 - 59
  • [9] REAMER CUTS DOWN ON COSTS.
    Anon
    Machinery and Production Engineering, 1979, 135 (3479): : 59 - 61
  • [10] VOC AIR STRIPPING CUTS COSTS.
    Jafek, Bev
    Waste Age, 1986, 17 (10): : 66 - 67