共 50 条
- [41] DEVELOPMENT OF CURRENT TAILINGS DAM DESIGN AND CONSTRUCTION METHODS. Mineral and Energy Resources, 1982, 25 (05):
- [42] Design and construction of Rafferty Dam on a massive Prairie clay foundation Canadian Geotechnical Conference, 1992, : 1 - 39
- [43] Design and construction of hydraulic tunnels at Gibe III dam, Ethiopia Tunn. Undergr. Cities: Eng. Innov. Meet Archaeol. Archit. Art - Proc. World Tunn. Congr., (1039-1048):
- [45] Morocco's 120 m-high Sidi Said RCC dam International Journal on Hydropower and Dams, 2003, 10 (06): : 58 - 61
- [48] Seismic stability modifications at Duke Power's Wateree dam - Part 2: Final design and construction REDUCING RISK FROM EXTREME EVENTS, 2003, : 569 - 581
- [49] Adaptive construction methodology for the Ghatghar Saddle dam, India's first RCC dam ROLLER COMPACTED CONCRETE DAMS, 2003, : 239 - 246
- [50] Kontagora Dam: aspects of design and construction of an embankment dam relevant to a remote rural area of West Africa Proceedings of the Institution of Civil Engineers (London). Part 1 - Design & Construction, 1988, 84 pt 1 : 855 - 874