GHOST TUNNEL BENEATH MOTORWAY.

被引:0
|
作者
Anon
机构
来源
International Construction | 1975年 / 14卷 / 02期
关键词
DIAPHRAGM WALLS;
D O I
暂无
中图分类号
学科分类号
摘要
The interesting detail of the tunnel structure was the connection between the diaphragm walls and the tunnel roof slab. The structural concrete of the diaphragm walls was only poured to a level of about 1. 8 m below the existing surface, while the top portion in the trench was made up with lean concrete. At some later stage the area of the tunnel roof was excavated, and appropriate blinding was placed to the exact level of the underside of the roof slab. At the same time the lean concrete topping was removed and the structural concrete and the protruding bars of the diaphragm walls were prepared for the subsequent roof concreting stage. Ventilation problems are discussed.
引用
收藏
页码:44 / 48
相关论文
共 50 条
  • [31] Design and construction issues of a motorway tunnel close to an active fault
    Alexandris, A.
    Griva, E.
    Abarioti, M.
    Vettas, P.
    Makadasis, J.
    Bournazos, J.
    TRANSPORT AND CITY TUNNELS - PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE UNDERGROUND CONSTRUCTIONS PRAGUE 2010, 2010, : 19 - 24
  • [32] Stability of the excavation face on a shield tunnel crossing beneath an existing tunnel
    Xue, Fei
    Zhang, Mengxi
    GEOTECHNICAL RESEARCH, 2020, 7 (02) : 96 - 102
  • [33] Tunnel Visp/Valais (CH) - challenges in a twin-tube motorway project incorporating an existing tunnel
    Waldmeyer, A.
    Schmaus, H.
    Hohberg, J. M.
    UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1055 - 1062
  • [34] POWER TUNNEL BORED BENEATH OLD DAM
    不详
    POWER ENGINEERING, 1984, 88 (07) : 56 - 56
  • [35] Behavior of existing tunnel beneath braced excavation
    Kamada, T.
    Ueno, K.
    Morioka, S.
    Oji, Y.
    Hashimoto, T.
    Konda, T.
    NEW FRONTIERS IN CHINESE AND JAPANESE GEOTECHNIQUES, 2007, : 236 - 246
  • [36] Water tunnel beneath New York Harbor
    Jafari, Mohammad R.
    Schultz, Michael
    Howard, Roger, Jr.
    NORTH AMERICAN TUNNELING 2008, PROCEEDINGS, 2008, : 2 - +
  • [37] An underground tunnel beneath Amsterdam Central Station
    deBoer, F
    vanderEem, HM
    GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 1996, : 105 - 109
  • [38] Driving down the costs on the Göttingen-Halle motorway tunnel
    Concrete Engineering International, 2006, 10 (01): : 12 - 13
  • [39] Theoretical solution of the influence of karst cavern beneath tunnel on the stability of tunnel structure
    He, Yiwu
    Fu, Helin
    Luo, Lifeng
    Liu, Yunsi
    Rao, Junying
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2014, 47 (10): : 128 - 135
  • [40] High speed railway line Cologne to Frankfurt, tunnel under the motorway intersection
    Quick, H
    Katzenbach, R
    TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 899 - 904