Behavior of existing tunnel beneath braced excavation

被引:0
|
作者
Kamada, T. [1 ]
Ueno, K. [1 ]
Morioka, S.
Oji, Y.
Hashimoto, T.
Konda, T.
机构
[1] NTT Infrastruct Network Co Ltd, Business Dev Dept, Chuo Ku, Osaka 5410056, Japan
关键词
neighboring construction; existing tunnel; rebound; prediction; monitoring on site; alluvial soft clay;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the construction of Nakanoshima Subway Line, one section constructed by cut and cover method crossed over an existing telecommunications tunnel, in alluvial soft clay. It was predicted that this work would influence the existing tunnel in both transverse and longitudinal directions, mainly due to the rebound of ground induced by braced excavation. Some predictions were conducted to investigate these influences, and the behaviors of the existing tunnel were monitored on site during excavation. By comparing the prediction values with measurement results, the influence of soil improvement is shown remarkably that cause the prediction values differ from the measurement results. Then, the prediction of the next construction stage was re-calculated based on the present observed data. The construction was finally accomplished smoothly and safely, while the most dangerous process, ground rebound in the final construction stage, was carefully constructed.
引用
收藏
页码:236 / 246
页数:11
相关论文
共 50 条
  • [1] Stability of the excavation face on a shield tunnel crossing beneath an existing tunnel
    Xue, Fei
    Zhang, Mengxi
    [J]. GEOTECHNICAL RESEARCH, 2020, 7 (02) : 96 - 102
  • [2] Ground behavior due to tunnel excavation with existing foundation
    Sung, Eunsu
    Shahin, Hossain M.
    Nakai, Teruo
    Hinokio, Masaya
    Yamamoto, Makoto
    [J]. SOILS AND FOUNDATIONS, 2006, 46 (02) : 189 - 207
  • [3] Analytical investigation for the circumferential behavior of the shield-driven tunnel adjacent to a braced excavation
    Cheng, H. Z.
    Chen, R. P.
    Wu, H. N.
    Meng, F. Y.
    [J]. GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2021, : 517 - 522
  • [4] A jet grout stabilized excavation beneath an existing building
    Ho, CE
    [J]. GROUTS AND GROUTING: A POTPOURRI OF PROJECTS, 1998, (80): : 1 - 15
  • [5] Effect of Blasting During Tunnel Excavation on an Existing Adjacent Tunnel
    Van Kien Dang
    Trong Hung Vo
    [J]. TEKNIK DERGI, 2022, 33 (05): : 12725 - 12740
  • [6] Impact of new undercrossing tunnel excavation on the stability of the existing tunnel
    Zhu, Qingli
    Ding, Yanping
    [J]. FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [7] Study on the Excavation Method of Cable Tunnel on Existing Subway Tunnel
    Jia, Yuzhuo
    Yu, Jing
    [J]. 3RD AASRI CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND BIOINFORMATICS (CIB 2015), 2015, : 32 - 34
  • [8] The effect of deep excavation on existing railway tunnel
    Mitew-Czajewska, M.
    [J]. GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2021, : 620 - 626
  • [9] Braced excavation - Excavation in general
    Tan, TS
    Shirlaw, JN
    [J]. GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2000, : 53 - 62
  • [10] Analytical solution for the response of an existing tunnel to a new tunnel excavation underneath
    Zhang, Dong-Mei
    Huang, Zhong-Kai
    Li, Zi-Li
    Zong, Xiang
    Zhang, Dong-Ming
    [J]. COMPUTERS AND GEOTECHNICS, 2019, 108 : 197 - 211