Design-build in Bosnia

被引:0
|
作者
Jantzer, A.L.
机构
[1] Buchart-Horn Inc. (B-H), Germany
[2] B-H's State College, PA, United States
来源
| 2001年 / Society of American Military Engineers卷 / 93期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] DOTs inch ahead in design-build
    ENR, 13 (22):
  • [42] Predicting performance of design-build and design-bid-build projects
    Ling, FYY
    Chan, SL
    Chong, E
    Ee, LP
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (01) : 75 - 83
  • [43] Value Creation in Design-Build Projects
    Bremdal, Jon Harald
    Haddadi, Amin
    Bjorberg, Svein
    Lohne, Jardar
    Laedre, Ola
    2017 12TH INTERNATIONAL SCIENTIFIC AND TECHNICAL CONFERENCE ON COMPUTER SCIENCES AND INFORMATION TECHNOLOGIES (CSIT), VOL. 2, 2017, : 58 - 66
  • [44] Design-build railroad bridge experience
    Kates, BC
    Niemietz, RD
    15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, PROCEEDINGS, 1998, : 407 - 410
  • [45] Design-build continues to grow in US
    不详
    CIVIL ENGINEERING, 1996, 66 (12): : 18 - 19
  • [46] The design-build (move) and historic preservation
    Laux, DR
    FORMING CIVIL ENGINEERING'S FUTURE, 1999, : 162 - 168
  • [47] Pros & cons of design-build contracts
    Canadian Consulting Engineer, 1997, : 12 - 14
  • [48] SUNDERLANDIA STRUGGLE + DESIGN-BUILD COOPERATIVE
    FLEETWOOD, M
    ARCHITECTS JOURNAL, 1977, 166 (42): : 747 - 748
  • [49] Concurrent engineering in design-build projects
    Anumba, Chimay J.
    Evbuomwan, Nosa F.O.
    Construction Management and Economics, 1997, 15 (03): : 271 - 281
  • [50] DESIGN-BUILD NEEDS OPERATING CLAUSE
    GRAF, E
    CIVIL ENGINEERING, 1995, 65 (12): : 29 - 29