New constraint-based approach for overhaul project scheduling with work space constraints

被引:0
|
作者
机构
来源
Int J Ind Eng Theory Appl Pract | / 2卷 / 123-131期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] A Constraint-Based Approach to Learning and Explanation
    Ciravegna, Gabriele
    Giannini, Francesco
    Melacci, Stefano
    Maggini, Marco
    Gori, Marco
    [J]. THIRTY-FOURTH AAAI CONFERENCE ON ARTIFICIAL INTELLIGENCE, THE THIRTY-SECOND INNOVATIVE APPLICATIONS OF ARTIFICIAL INTELLIGENCE CONFERENCE AND THE TENTH AAAI SYMPOSIUM ON EDUCATIONAL ADVANCES IN ARTIFICIAL INTELLIGENCE, 2020, 34 : 3658 - 3665
  • [42] A CONSTRAINT-BASED APPROACH TO SPATIOTEMPORAL REASONING
    GUESGEN, HW
    HERTZBERG, J
    [J]. APPLIED INTELLIGENCE, 1993, 3 (01) : 71 - 90
  • [43] A constraint-based approach to Enigma 1225
    Cambazard, Hadrien
    O'Sullivan, Barry
    Smith, Barbara M.
    [J]. COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2009, 58 (08) : 1487 - 1497
  • [44] A Constraint-Based Approach for Visualization and Animation
    Takahashi S.
    Matsuoka S.
    Miyashita K.
    Hosobe H.
    Kamada T.
    [J]. Constraints, 1998, 3 (1) : 61 - 86
  • [45] The metre of 'Beowulf'. A constraint-based approach
    Feulner, Anna Helene
    [J]. BEITRAGE ZUR GESCHICHTE DER DEUTSCHEN SPRACHE UND LITERATUR, 2008, 130 (01): : 117 - 126
  • [46] A CONSTRAINT-BASED SCHEDULING MODEL FOR OPTIMAL TRAIN DISPATCHING
    Rodriguez, Joaquin
    Marliere, Gregory
    Sobieraj, Sonia
    [J]. PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, VOL 2, 2010, : 399 - 406
  • [47] CAMPS: a constraint-based architecturefor multiagent planning and scheduling
    Kazuo Miyashita
    [J]. Journal of Intelligent Manufacturing, 1998, 9 : 147 - 154
  • [48] Constraint-based proactive scheduling for MPTCP in wireless networks
    Oh, Bong-Hwan
    Lee, Jaiyong
    [J]. COMPUTER NETWORKS, 2015, 91 : 548 - 563
  • [49] Embedded System Verification Through Constraint-Based Scheduling
    El-Mahi, Olfat
    Pesant, Gilles
    Nicolescu, Gabriela
    Beltrame, Giovanni
    [J]. RAPID SYSTEM PROTOTYPING: SHORTENING THE PATH FROM SPECIFICATION TO PROTOTYPE (RSP 2013), 2013, : 73 - 79
  • [50] On supporting Lean methodologies using constraint-based scheduling
    van der Krogt, Roman
    Geraghty, John
    Salman, Mustafa Ramzi
    Little, James
    [J]. JOURNAL OF SCHEDULING, 2010, 13 (04) : 301 - 314