Cost and time benchmarking in semiconductor manufacturing facilities construction

被引:0
|
作者
Patel, Sachin [1 ]
Chasey, Allan D. [1 ]
机构
[1] Arizona State University
来源
关键词
Delivery processes - Design-bid build project - Semiconductor manufacturing facilities - Time frame;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:10 / 23
相关论文
共 50 条
  • [31] Hierarchical modeling and control of re-entrant semiconductor manufacturing facilities
    ElAdl, MK
    Rodriguez, AA
    Tsakalis, KS
    PROCEEDINGS OF THE 35TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-4, 1996, : 1736 - 1742
  • [32] A Dynamic Sampling Approach for Cost Reduction in Semiconductor Manufacturing
    Susto, Gian Antonio
    Maggipinto, Marco
    Zocco, Federico
    McLoone, Sean
    28TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING (FAIM2018): GLOBAL INTEGRATION OF INTELLIGENT MANUFACTURING AND SMART INDUSTRY FOR GOOD OF HUMANITY, 2018, 17 : 1031 - 1038
  • [33] Concurrent Design for Robust and Cost Efficient Semiconductor Manufacturing
    Lee, Foo Yeong
    Lin, Lim Siew
    Yong, Wang Mei
    PROCEEDINGS OF THE 2010 34TH IEEE/CPMT INTERNATIONAL ELECTRONICS MANUFACTURING TECHNOLOGY CONFERENCE (IEMT 2010), 2011,
  • [34] INTEGRATED COST AND PRODUCTIVITY LEARNING IN CMOS SEMICONDUCTOR MANUFACTURING
    LEONOVICH, GA
    FRANCHINO, AP
    MILLER, WJ
    TSOU, UE
    IBM JOURNAL OF RESEARCH AND DEVELOPMENT, 1995, 39 (1-2) : 201 - 213
  • [35] Cost effective AMC control strategy for semiconductor manufacturing
    Kümmerle, K
    Hollemann, S
    Schottler, M
    INSTITUTE OF ENVIRONMENTAL SCIENCES AND TECHNOLOGY, PROCEEDINGS 1999: CONTAMINATION CONTROL - DESIGN, TEST, AND EVALUATION - PRODUCT RELIABILITY, 1999, : 30 - 35
  • [36] Cost modelling as decision support when locating manufacturing facilities
    Windmark, Christina
    Andersson, Carin
    INTERNATIONAL JOURNAL OF PRODUCTION MANAGEMENT AND ENGINEERING, 2016, 4 (01) : 15 - 27
  • [37] Cycle time reduction for semiconductor wafer fabrication facilities
    Meyersdorf, D
    Yang, TH
    1997 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP - ASMC 97 PROCEEDINGS: THEME - THE QUEST FOR SEMICONDUCTOR MANUFACTURING EXCELLENCE: LEADING THE CHARGE INTO THE 21ST CENTURY, 1997, : 418 - 423
  • [38] Quantification and benchmarking of construction waste and its impact on cost - a case of Pakistan
    Shahid, Muhammad Usman
    Thaheem, Muhammad Jamaluddin
    Arshad, Husnain
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (06) : 2304 - 2333
  • [39] Constant time interval simulation for semiconductor manufacturing
    Miyashita, K
    Ozaki, H
    Senoh, K
    Matsuo, H
    ETFA 2003: IEEE CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 1, PROCEEDINGS, 2003, : 364 - 371
  • [40] Production Control in Semiconductor manufacturing with Time Constraints
    Sadeghi, Rezvan
    Dauzere-Peres, Stephane
    Yugma, Claude
    Lepelletier, Guillaume
    2015 26TH ANNUAL SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE (ASMC), 2015, : 29 - 33