Quantification and benchmarking of construction waste and its impact on cost - a case of Pakistan

被引:20
|
作者
Shahid, Muhammad Usman [1 ]
Thaheem, Muhammad Jamaluddin [2 ]
Arshad, Husnain [3 ]
机构
[1] Natl Univ Sci & Technol, Dept Construct Engn & Management, Islamabad, Pakistan
[2] Deakin Univ, Sch Architecture & Built Environm, Geelong Waterfront Campus, Geelong, Vic, Australia
[3] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon, Hong Kong, Peoples R China
关键词
Construction waste; Quantitative data; Subcontracting; Cost impact; Waste management plan; DEMOLITION WASTE; ENVIRONMENTAL PERFORMANCE; RESIDENTIAL BUILDINGS; MAIN CAUSES; MANAGEMENT; GENERATION; INDUSTRY; SYSTEM; PREFABRICATION; MINIMIZATION;
D O I
10.1108/ECAM-07-2019-0375
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose The construction industry struggles in environmental and economic performance due to waste generation. Several studies have measured this waste in the construction industry of developing countries like India, Brazil, China, Nigeria and Iran, and proposed strategies to enhance the overall efficiency. But no such work exists in Pakistan's context. The construction industry of Pakistan contributes significantly to the country's gross domestic product (GDP). And with several mega projects in progress to overcome the energy crises and improve the infrastructure of the country, the absence of proper waste management policies and plans calls for empirical research. Therefore, this study quantifies and benchmarks material waste in the local context, its impact on project cost and the effect of multiple subcontracting arrangements on waste generation. It also proposes a conceptual waste management plan (WMP) for local conditions which can be generalized for developing countries. Design/methodology/approach This paper uses a mixed research approach by leveraging Saunders's research onion model. To benchmark the current wastage practices, quantitative data of material waste in the Pakistani construction industry are gathered through document review of accounting systems, inventory and payment records of 40 completed building projects. Using the data, the waste rate of different materials is measured along with their impact on cost. Additionally, the role of subcontracting arrangements in waste generation is also investigated. Also, semi-structured interviews are conducted with project managers of high- and low-performing construction organizations to propose a conceptual WMP for the local industry and developing countries. Findings The highest wasteful materials by quantity are wood, sand and concrete blocks, and those by cost are wood, bricks and steel. By quantity, 123% more material was used on average than the actual productive work. Also, the labor only (L-O) subcontracting arrangement causes maximum waste. Moreover, the difference between the highest (155%) and lowest wasting company (104%) is 51%, highlighting the proactive and resistive waste management culture and approach by the worst- and best-performing companies. Further, the impact of waste quantities is more than 2% of the project cost. Finally, a conceptual model consisting of measures at the project, industry and national levels is also proposed as a guide for developing countries. Practical implications The findings of this benchmarking study can help improve the project planning, execution and monitoring, and control practices by providing a better understanding of the material waste potential. This will help economize the construction industry and improve its sustainability. Originality/value This is the first benchmarking study that quantitatively measures material waste in the construction industry of Pakistan. It highlights that costly as well as sustainability-implicating materials are frequently wasted in the local construction projects. Also, this study correlates the wastage with subcontracting arrangements. Additionally, an original conceptual WMP is proposed that could help the industry improve its performance. The findings could help the construction professionals identify the loopholes in their material management practices and not only save money but also ensure better sustainability.
引用
收藏
页码:2304 / 2333
页数:30
相关论文
共 50 条
  • [1] Benchmarking lean construction conformance in Pakistan's construction industry
    Aslam, Mughees
    Baffoe-Twum, Edmund
    Malik, Sohail
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (05) : 2077 - 2100
  • [2] The Quantification of Local Construction Waste for the Current Construction Waste Management Practices: A Case Study in Klang Valley
    Noor, Raja Nor Husna Raja Mohd
    Ridzuan, Ahmad Ruslan Mohd
    Endut, Intan Rohani
    Noordin, Basir
    Shehu, Zayyana
    Ghani, Abdul Halim Abdul
    2013 IEEE BUSINESS ENGINEERING AND INDUSTRIAL APPLICATIONS COLLOQUIUM (BEIAC 2013), 2013, : 183 - 188
  • [3] IMPACT OF CONSTRUCTION WASTE MINIMIZATION AT CONSTRUCTION SITE: CASE STUDY
    Umar, Usman Aminu
    Shafiq, Nasir
    Malakahmad, Amirhossein
    Nuruddin, Muhd Fadhil
    Khamidi, Mohd Faris
    Salihi, Ibrahim Umar
    JURNAL TEKNOLOGI, 2016, 78 (5-3): : 33 - 40
  • [4] Construction waste: Quantification and source evaluation
    Bossink, BAG
    Brouwers, HJH
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1996, 122 (01) : 55 - 60
  • [5] QUANTIFICATION OF CARBON POTENTIAL OF CONSTRUCTION WASTE TREATMENT: A CASE STUDY OF GUANGZHOU, CHINA
    Liu, Jingkuang
    Tan, Xiaomin
    Zheng, Jiaxi
    Wang, Zhenshuang
    JOURNAL OF GREEN BUILDING, 2024, 19 (03): : 221 - 244
  • [6] Cost and time benchmarking in semiconductor manufacturing facilities construction
    Patel, Sachin
    Chasey, Allan D.
    Cost Engineering (Morgantown, West Virginia), 2005, 47 (10): : 10 - 23
  • [7] Quantification and environmental impact of slaughter waste during its life cycle
    Bhave, Prashant P.
    Palekar, Areej L.
    ENVIRONMENTAL MONITORING AND ASSESSMENT, 2024, 196 (02)
  • [8] Quantification and environmental impact of slaughter waste during its life cycle
    Prashant P. Bhave
    Areej L. Palekar
    Environmental Monitoring and Assessment, 2024, 196
  • [9] Material Based Penalty-Cost Quantification Model for Construction Projects Influencing Waste Management
    Nawaz, Ahsan
    Chen, Jian
    Su, Xing
    Hassan, Hafiz Muhammad Zahid
    FRONTIERS IN ENVIRONMENTAL SCIENCE, 2022, 10
  • [10] Quantification of the Cost of Oversizing Cooling Installations in a Case Study Under Construction in Vietnam
    Marques, Pedro
    Vandecasteele, Mathias
    Kien Le Trung
    Boydens, Wim
    PROCEEDINGS OF BUILDING SIMULATION 2021: 17TH CONFERENCE OF IBPSA, 2022, 17 : 3400 - 3401