EVOLUTION OF CUT-AND-FILL MINING AT INCO'S THOMPSON MINE.

被引:0
|
作者
Humphrey, Raymond B.
Nicholson, Edmund C.
机构
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
NICHEL MINES AND MINING
引用
收藏
页码:13 / 19
相关论文
共 45 条
  • [31] Cemented Paste Backfill Geomechanics at a Narrow-Vein Underhand Cut-and-Fill Mine
    Michael Jon Raffaldi
    Joseph Bradford Seymour
    Jerald Richardson
    Eric Zahl
    Mark Board
    [J]. Rock Mechanics and Rock Engineering, 2019, 52 : 4925 - 4940
  • [32] Cemented Paste Backfill Geomechanics at a Narrow-Vein Underhand Cut-and-Fill Mine
    Raffaldi, Michael Jon
    Seymour, Joseph Bradford
    Richardson, Jerald
    Zahl, Eric
    Board, Mark
    [J]. ROCK MECHANICS AND ROCK ENGINEERING, 2019, 52 (12) : 4925 - 4940
  • [33] Initiation and evolution of knickpoints and their role in cut-and-fill processes in active submarine channels
    Guiastrennec-Faugas, Lea
    Gillet, Herve
    Peakall, Jeff
    Dennielou, Bernard
    Gaillot, Arnaud
    Jacinto, Ricardo Silva
    [J]. GEOLOGY, 2021, 49 (03) : 314 - 319
  • [34] APPLICATION OF DYNAMIC-PROGRAMMING TO THE GRADE CONTROL AND SCHEDULING IN A CUT-AND-FILL MINING METHOD
    MUGE, FH
    SANTOS, NA
    [J]. 21ST APPLICATION OF THE COMPUTERS AND OPERATIONS RESEARCH IN THE MINERAL INDUSTRY, 1989, : 479 - 484
  • [35] CONVERSION FROM POST PILLAR CUT-AND-FILL MINING TO BLASTHOLE - A CASE-STUDY AT FALCONBRIDGE
    BHARTI, S
    LEBL, J
    CORNETT, DJ
    [J]. CIM BULLETIN, 1983, 76 (849): : 61 - 68
  • [36] EXPERIMENT AND RESEARCH IN UNDERHAND CUT-AND-FILL MINING METHOD IN LINGSHAN No5 VEIN.
    Yin, Wei-nong
    Wang, Dai-xun
    Hu, Xiu-zhang
    Li, Yun-jian
    [J]. Changsha Kuangshan Yanjiuyuan Jikan/Quarterly of the Changsha Institute of Mining Research, 1985, 5 (04): : 1 - 8
  • [37] A robust mixed integer linear programming framework for underground cut-and-fill mining production scheduling
    Huang, Shuwei
    Li, Guoqing
    Ben-Awuah, Eugene
    Afum, Bright Oppong
    Hu, Nailian
    [J]. INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2020, 34 (06) : 397 - 414
  • [38] Stability of Coal Pillars and Backfill Due to Intermittent Cut-and-Fill Mining Under Loose Aquifer
    Liu, Jiawei
    Yin, Zhenyu
    Xia, Yingzhi
    [J]. ENGINEERING GEOLOGY FOR A HABITABLE EARTH, VOL 2, IAEG XIV CONGRESS 2023, 2024, : 413 - 428
  • [39] STOPES WALLS STABILIZATION AT THE RICH IRON ORE MINING BY THE FLAT-BACK CUT-AND-FILL METHOD
    Zubov, V. P.
    Morozov, M. D.
    Malyutin, A. S.
    [J]. JOURNAL OF MINING INSTITUTE, 2014, 207 : 26 - 32
  • [40] Determination of the Required Strength of Artificial Roof for the Underhand Cut-and-Fill Mine Using Field Measurements and Theoretical Analysis
    Han, Bin
    Ji, Kun
    Wang, Jiandong
    Wang, Shibo
    Zhang, Peng
    Hu, Yafei
    [J]. SUSTAINABILITY, 2023, 15 (01)