Test study of shield cutting large-diameter reinforced concrete piles directly

被引:0
|
作者
Wang, Fei [1 ]
Yuan, Dajun [1 ]
Dong, Chaowen [2 ]
Han, Bing [3 ]
Nan, Haoren [4 ]
Wang, Mengshu [1 ]
机构
[1] Tunnel and Underground Engineering Research Center of Ministry of Education, Beijing Jiaotong University, Beijing 100044, China
[2] Suzhou Rail Transit Co., Ltd., Suzhou, Jiangsu 215004, China
[3] China Railway 13th Bureau Group Co., Ltd., Tianjin 300308, China
[4] Japan Komatsu(China) Investment Co., Ltd., Shanghai 200120, China
关键词
Piles;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:2566 / 2574
相关论文
共 50 条
  • [31] Experimental development of the design of an expansion joint for a large-diameter reinforced-concrete pipeline
    Zaitsev, V.N.
    Mikhailov, O.V.
    Berezinskii, S.A.
    Lgalov, V.V.
    Lyapin, O.B.
    [J]. Hydrotechnical Construction (English translation of Gidrotekhnicheskoe Stroitel'stvo), 1988, : 163 - 166
  • [32] Horizontal dynamic response of offshore large-diameter pipe piles
    Zheng, Changjie
    Lin, Hao
    Cao, Guangwei
    Luan, Lubao
    [J]. OCEAN ENGINEERING, 2023, 272
  • [33] Prediction of load-settlement relationship for large-diameter piles
    Xiao, HB
    Luo, QZ
    Tang, J
    Li, QS
    [J]. STRUCTURAL DESIGN OF TALL BUILDINGS, 2002, 11 (04): : 285 - 293
  • [34] The influence of erosion voids on the longitudinal behaviour of a jointed large-diameter reinforced concrete pipeline
    Xu, Ming
    Shen, Dawei
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2020, 103
  • [35] Influence of erosion voids and traffic loads on buried large-diameter reinforced concrete pipes
    Xu, Ming
    Shen, Dawei
    [J]. UNDERGROUND SPACE, 2024, 17 (120-131) : 120 - 131
  • [36] Use of large-diameter, cast-in situ concrete pipe piles for embankment over soft clay
    Liu, Han-Long
    Chu, Jian
    Deng, An
    [J]. CANADIAN GEOTECHNICAL JOURNAL, 2009, 46 (08) : 915 - 927
  • [37] Hobbing of cylindrical gears by large-diameter cutting heads
    V. D. Artamonov
    [J]. Russian Engineering Research, 2007, 27 (12) : 929 - 931
  • [38] Case study on pile running during the driving process of large-diameter pipe piles
    Sun, Liqiang
    Wang, Yandi
    Guo, Wei
    Yan, Shuwang
    Chu, Jian
    Liu, Xiaoqiang
    [J]. MARINE GEORESOURCES & GEOTECHNOLOGY, 2018, 36 (06) : 709 - 721
  • [39] Mechanical response of large-diameter shield tunnels during assembly
    Feng K.
    Xu K.
    Peng Z.-Z.
    Zhou Z.-Y.
    He C.
    Xiao M.-Q.
    [J]. Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2019, 41 (12): : 2243 - 2252
  • [40] Molding quality inspection method for large-diameter shield tunnels
    Zhao X.
    Deng K.
    Zhang Y.
    Ma Y.
    Xia Y.
    [J]. Gongcheng Kexue Xuebao/Chinese Journal of Engineering, 2024, 46 (02): : 365 - 375