Mechanical response of large-diameter shield tunnels during assembly

被引:0
|
作者
Feng, Kun [1 ]
Xu, Kai [1 ]
Peng, Zu-Zhao [2 ]
Zhou, Zi-Yang [1 ]
He, Chuan [1 ]
Xiao, Ming-Qing [3 ]
机构
[1] Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu,610031, China
[2] Guangzhou Municipal Engineering Design and Research Institute, Guangzhou,510030, China
[3] China Railway SIYUAN Survey and Design Group Co., Ltd., Wuhan,430071, China
关键词
Assembly - Axial flow - Geotechnical engineering - Bending moments;
D O I
10.11779/CJGE201912009
中图分类号
学科分类号
摘要
Based on loading analysis of shield tunnel segments during the assembly phase, a finite difference model is established for segmental lining structure in assembly stage. The mechanical response of segments during assembling is analyzed regarding the in-situ test results of Shiziyang Intercity Railway Tunnel Project from Foshan to Dongguan. The results show that: (1) The measured values of axial force of segment monitoring section are mainly under compression during assembling process, but in the initial stage of assembling, the local tension exists and the calculated values are under compression. The measured and calculated values of bending moment show obvious positive bending trends. (2) The maximum measured values of axial force, positive bending moment and negative bending moment of segments after the ring is formed are about 1.5 times, 1.28 times and 1.36 times the calculated values, respectively. (3) The response of segment bending moment is more sensitive to assembly process than that of axial force. (4) The adjacent block assembly has the most significant effects on the axial force and bending moment of the segment, and the effects of F block insertion are subordinate. Other assembly steps have less influences, and the closer to the adjacent block and F block, the greater the internal force response. (5) The calculated and measured values of segment axial force and bending moment are approximately symmetrical along the radial central axis of the capping block after assembly, and the symmetry of the calculated values is more obvious than the measured values in the assembly process. (6) During the assembling process, the maximum measured axial force reaches 43.5% of the maximum calculated value of the beam-spring model in the serviceability limit stage, however, the maximum positive and negative bending moments reach 188.89% and 447.84%. It is indicated that the internal force response during assembling process is at a higher level during construction, which makes the segment often in a disadvantageous condition of large bending moment and small axial force when tunneling in full-face rocks. It is rational to pay more attention in design and construction. © 2019, Editorial Office of Chinese Journal of Geotechnical Engineering. All right reserved.
引用
收藏
页码:2243 / 2252
相关论文
共 50 条
  • [1] Molding quality inspection method for large-diameter shield tunnels
    Zhao, Xianqiong
    Deng, Kai
    Zhang, Yazhou
    Ma, Yingbo
    Xia, Yimin
    [J]. Gongcheng Kexue Xuebao/Chinese Journal of Engineering, 2024, 46 (02): : 365 - 375
  • [2] Seismic response analysis of large-diameter shield tunnels considering the segment joint effect
    Dong, Fei
    Zhang, Dingli
    Fang, Qian
    Zhu, Wenjun
    Chen, Liping
    Tai, Qimin
    [J]. Modern Tunnelling Technology, 2015, 52 (04) : 111 - 120
  • [3] Influence of secondary lining thickness on mechanical behaviours of double-layer lining in large-diameter shield tunnels
    Wang, Shimin
    He, Xuhu
    Peng, Xiaoyu
    Wang, Ya
    Li, Zhengxin
    Song, Zihan
    [J]. UNDERGROUND SPACE, 2024, 18 : 130 - 150
  • [4] Response of operating metro tunnels to compensation grouting of an underlying large-diameter shield tunnel: A case study in Hangzhou
    Gan, Xiaolu
    Yu, Jianlin
    Gong, Xiaonan
    Hou, Yongmao
    Liu, Nianwu
    Zhu, Min
    [J]. UNDERGROUND SPACE, 2022, 7 (02) : 219 - 232
  • [5] Failure mechanism of large-diameter shield tunnels and its effects on ground surface settlements
    Yang Yu-you
    Li Hong-an
    [J]. JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2012, 19 (10) : 2958 - 2965
  • [6] Lisbon Metro - settlement behaviour of large-diameter shield-driven and NATM tunnels
    Simic, D
    Craig, RN
    [J]. TUNNELLING '97, 1997, : 421 - 438
  • [7] Failure mechanism of large-diameter shield tunnels and its effects on ground surface settlements
    杨宇友
    李宏安
    [J]. Journal of Central South University, 2012, 19 (10) : 2958 - 2965
  • [8] Analysis on Impact of Adjacent Foundation Pit Excavation on Deformation of Large-diameter Shield Tunnels
    Chen, Renpeng
    Gao, Tianhui
    Wu, Huaina
    Meng, Fanyan
    Cheng, Hongzhan
    [J]. Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (09): : 230 - 240
  • [9] Failure mechanism of large-diameter shield tunnels and its effects on ground surface settlements
    Yu-you Yang
    Hong-an Li
    [J]. Journal of Central South University, 2012, 19 : 2958 - 2965