- [1] The AP1000 Plant and the China Project Commissioning Success [J]. JOURNAL OF NUCLEAR ENGINEERING AND RADIATION SCIENCE, 2019, 5 (01):
- [2] The Summary and Research on Nuclear Island Construction and Erection Cost Management of AP1000 Nuclear Power Plant Project [J]. PROCEEDINGS OF THE 20TH PACIFIC BASIN NUCLEAR CONFERENCE, VOL 1, 2017, : 941 - 953
- [3] Study on Schedule Control in AP1000 Nuclear Plant Project [J]. PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 6, 2011, : 181 - 186
- [4] First Westinghouse AP1000 nuclear plant Sanmen 1 completes commissioning [J]. ATW-INTERNATIONAL JOURNAL FOR NUCLEAR POWER, 2018, 63 (8-9): : 484 - 484
- [6] Lifting Operation Safety Management in AP1000 Nuclear Plant Project [J]. PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2013, VOL 5, 2014,
- [7] Study on HSE Management system of AP1000 Nuclear Plant Project [J]. PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 2, 2011, : 385 - 390
- [9] Schedule management of nuclear island design of first kind of AP1000 unit [J]. Liu, Xiaoheng, 1600, Atomic Energy Press (35):
- [10] Analysis of adaptability of AP1000 passive safety systems commissioning to nuclear safety laws and guidelines [J]. 1600, Atomic Energy Press (37): : 110 - 115