Start date for Pantsir-S1 assembly

被引:0
|
作者
机构
来源
Jane's Def. Weekly | 2006年 / OCT.卷
关键词
Contracts - Industrial economics - Military operations - Product development - Research and development management - Tracking (position);
D O I
暂无
中图分类号
学科分类号
摘要
KBP Instrument Design Bureau has planned to begin assembly of the first 96K6 Pantsir-S1 self-propelled (SP) short-range gun/surface-to-air missile air-defense systems for the United Arab Emirates (UAE) in November 2006. The UAE signed a USD734 million contract in 2000 for the development and delivery of 50 Pantsir-S1 systems. The development was delayed because the Moscow-based Fazotron-NIIR corporation failed to complete the development of the system's Shlem (helmet) tracking and guidance radar on time. An additional contract of USDF66 million was signed for more research and development work, increasing the total cost of the Pantsir-S1priogramme for the UAE to USD800 million. The system will be delivered on an 8 × 8 wheeled platform acquired by the UAE from MAN trucks to the UAE in 2007.
引用
收藏
相关论文
共 50 条
  • [1] Deliveries of Pantsir-S1 to start in 2006
    2005, Jane's Information Group
  • [2] QUESTIONING LIFE'S START DATE
    Lavelle, Judith
    CHEMICAL & ENGINEERING NEWS, 2015, 93 (48) : 40 - 41
  • [3] On the date of start of Ermak's Siberian campaign
    Solodkin, Ya. G.
    VOPROSY ISTORII, 2010, (12) : 168 - 170
  • [4] A Trainee's Perspective: Delay the Fellowship Start Date
    Nagata, Jason M.
    ACADEMIC MEDICINE, 2017, 92 (07) : 897 - 897
  • [5] Pantsir-S1E混合型防空系统
    侯晓艳
    张进
    飞航导弹, 2008, (07) : 5 - 6
  • [6] Phazotron-NIIR shows Pantsir-S1E radar
    Gyürösi, Miroslav
    Jane's Missiles and Rockets, 2005, (DEC.): : 85 - 86
  • [7] Constantine's 'Speech to the Assembly of the Saints': Place and date of delivery
    Barnes, TD
    JOURNAL OF THEOLOGICAL STUDIES, 2001, 52 : 26 - 36
  • [8] Match Date-to-Start Date: Engaging Fellows Pre-Training
    Kaur, Supreet
    Lovelace, Shannon
    Karnad, Anand
    BLOOD, 2023, 142
  • [9] Delayed start date leads to constructive acceleration
    Loulakis, MC
    Santiago, SJ
    CIVIL ENGINEERING, 2000, 70 (05): : 96 - 96
  • [10] Delaying the Fellowship Start Date in Obstetrics and Gynecology
    Banks, Erika
    George, Karen E.
    Doulaveris, George
    Gressel, Gregory M.
    Sax, Megan
    Connolly, AnnaMarie
    OBSTETRICS AND GYNECOLOGY, 2023, 141 (06): : 1154 - 1159