Start date for Pantsir-S1 assembly

被引:0
|
作者
机构
来源
Jane's Def. Weekly | 2006年 / OCT.卷
关键词
Contracts - Industrial economics - Military operations - Product development - Research and development management - Tracking (position);
D O I
暂无
中图分类号
学科分类号
摘要
KBP Instrument Design Bureau has planned to begin assembly of the first 96K6 Pantsir-S1 self-propelled (SP) short-range gun/surface-to-air missile air-defense systems for the United Arab Emirates (UAE) in November 2006. The UAE signed a USD734 million contract in 2000 for the development and delivery of 50 Pantsir-S1 systems. The development was delayed because the Moscow-based Fazotron-NIIR corporation failed to complete the development of the system's Shlem (helmet) tracking and guidance radar on time. An additional contract of USDF66 million was signed for more research and development work, increasing the total cost of the Pantsir-S1priogramme for the UAE to USD800 million. The system will be delivered on an 8 × 8 wheeled platform acquired by the UAE from MAN trucks to the UAE in 2007.
引用
收藏
相关论文
共 50 条
  • [21] It's a Date
    Snow, Miriam B.
    LIBRARY JOURNAL, 1950, 75 (21) : 2084 - 2084
  • [22] It's a date
    Wagman, David
    POWER ENGINEERING, 2007, 111 (07) : 5 - 5
  • [23] It's a date
    Allison, MH
    DR DOBBS JOURNAL, 1996, 21 (09): : 8 - +
  • [24] The National Diabetes Prevention Program: Does Start Date Matter?
    Ely, Elizabeth
    Bell, Miriam
    DIABETES, 2020, 69
  • [25] INFLUENCE OF MEAN DAILY TEMPERATURE ON THE SELECTION OF THE CONSTRUCTION START DATE
    Kummer, Markus
    Hofstadler, Christian
    IMPLEMENTING INNOVATIVE IDEAS IN STRUCTURAL ENGINEERING AND PROJECT MANAGEMENT, 2015, : 851 - 856
  • [26] NEW START DATE FOR MEDICAL POSTS - DIRECTIVE SHOULD BE WITHDRAWN
    MILLER, PD
    BRITISH MEDICAL JOURNAL, 1994, 308 (6941): : 1442 - 1442
  • [27] Reducing Trainee Stress by Delaying the Pediatric Fellowship Start Date
    Mink, Richard B.
    Wininger, David A.
    Turner, Adam
    Leslie, Laurel K.
    Balmer, Dorene F.
    Hofkosh, Dena
    McGuinness, Gail A.
    Muchmore, Elaine A.
    PEDIATRICS, 2020, 146 (03)
  • [28] Delaying the Start Date for Obstetrics and Gynecology Subspecialty Training and Inequity
    Ros, Stephanie T.
    Malhotra, Tani
    Grobman, William
    Hughes, Brenna L.
    Gyamfi-Bannerman, Cynthia
    OBSTETRICS AND GYNECOLOGY, 2023, 141 (01): : 223 - 225
  • [29] SCHEDULING WITH EARLIEST START AND DUE DATE CONSTRAINTS ON MULTIPLE MACHINES
    BRATLEY, P
    FLORIAN, M
    ROBILLARD, P
    NAVAL RESEARCH LOGISTICS, 1975, 22 (01) : 165 - 173
  • [30] Due date assignment for multistage assembly systems
    Amir Azaron
    Farhad Kianfar
    Optimization Letters, 2009, 3