Risk assessment method of power grid construction project investment based on grey relational analysis

被引:0
|
作者
Chen F. [1 ]
Sun M. [2 ]
Shen L. [1 ]
机构
[1] State Grid Anhui Electric Power Co., Ltd., Economic Research Institute Co., Ltd., Hefei
[2] State Grid Lu’an Electric Power Supply Company, Lu’an
关键词
correlation matrix; forward backward algorithm; grey correlation analysis; relevance; weight calculation;
D O I
10.1504/IJITM.2024.139576
中图分类号
学科分类号
摘要
In view of the problems of low accuracy, long time consuming and low efficiency of the existing engineering investment risk assessment method; this paper puts forward the investment risk assessment method of power grid construction project based on grey correlation analysis. Firstly, classify the risks of power grid construction project; secondly, determine the primary index and secondary index of investment risk assessment of power grid construction project; then construct the correlation coefficient matrix of power grid project investment risk to calculate the correlation degree and weight of investment risk index; finally, adopt the grey correlation analysis method to construct investment risk assessment function to realise investment risk assessment. The experimental results show that the average accuracy of evaluating the investment risk of power grid construction projects using the method is 95.08%, and the maximum time consuming is 49 s, which proves that the method has high accuracy, short time consuming and high evaluation efficiency. Copyright © 2024 Inderscience Enterprises Ltd.
引用
收藏
页码:244 / 260
页数:16
相关论文
共 50 条
  • [41] The investment risk analysis of wind power project in China
    Li, Cun-bin
    Lu, Gong-shu
    Wu, Si
    RENEWABLE ENERGY, 2013, 50 : 481 - 487
  • [42] Gray Relational Analysis based Method for Information Security Risk Assessment
    Zhou, Li
    Zhou, Yanhui
    PROCEEDINGS OF 2012 7TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE & EDUCATION, VOLS I-VI, 2012, : 1086 - 1089
  • [43] DEA Based Research on Investment Efficiency of Power Grid Marketing Project
    Tong, Jun
    Zhu, Bin
    Wen, Ming
    Miu, Zheng-zhuan
    INTERNATIONAL CONFERENCE ON MATHEMATICS, MODELLING AND SIMULATION TECHNOLOGIES AND APPLICATIONS (MMSTA 2017), 2017, 215 : 545 - 550
  • [44] Grey Relational Analysis Method for Group Decision Making in Credit Risk Analysis
    Wu, Wenshuai
    EURASIA JOURNAL OF MATHEMATICS SCIENCE AND TECHNOLOGY EDUCATION, 2017, 13 (12) : 7913 - 7920
  • [45] Power Grid Risk Assessment Method Based on Risk Probability Engineering and Its Application
    Liu, Sha
    Shi, Xiaoqiang
    Wang, Tianhua
    Zhang, Yuan
    Cao, Yankun
    2016 IEEE INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2016,
  • [46] Study on Ship Financing Risk Evaluation of Shipping Enterprises Based on Grey Relational Analysis Method
    Wang, Yong
    Shang, Pingping
    2015 3rd International Conference on Education Reform and Management Innovation (ERMI 2015), Pt 1, 2015, 78 : 190 - 196
  • [47] A fuzzy approach to construction project risk assessment and analysis: construction project risk management system
    Carr, V
    Tah, JHM
    ADVANCES IN ENGINEERING SOFTWARE, 2001, 32 (10-11) : 847 - 857
  • [48] Software effort estimation method based on grey relational analysis
    Fu, Ya-Fang
    Yang, Ren-Nong
    Liu, Xiao-Dong
    Wang, Lin
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2012, 34 (11): : 2384 - 2389
  • [49] Evaluate the risk of real estate investment project based on the Grey System Theory
    Yuan Zhixue
    Chen Jingwu
    PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 866 - 869
  • [50] A Model of Risk Assessment of Software Project Based on Grey Theory
    Pang Qinghua
    ICCSSE 2009: PROCEEDINGS OF 2009 4TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE & EDUCATION, 2009, : 538 - 541