Scheduling an assembly job shop production system with multiple objectives: A simulation study

被引:0
|
作者
Paul M. [1 ]
Sridharan R. [1 ]
RadhaRamanan T. [1 ]
机构
[1] Department of Mechanical Engineering, National Institute of Technology, Calicut
关键词
A[!text type='JS']JS[!/text; Assembly job shop; GRA; Grey relational analysis; Multi-objective; Scheduling; Simulation;
D O I
10.1504/IJISE.2019.102049
中图分类号
学科分类号
摘要
This paper presents the salient aspects of the performance analysis of two mechanisms for shop floor control namely, order review/release (ORR) and dispatching rules in an assembly job shop system in a multi-objective environment. A simulation model of an assembly job shop is developed for experimentation with eight dispatching rules and four ORR mechanisms from the literature. An ORR policy based on the concept of backward scheduling and interval release is developed and incorporated in the simulation model. Grey relational analysis is used for ranking the ORR policy-dispatching rule combinations. Multivariate and univariate hypotheses are developed. The results are analysed using ANOVA and MANOVA. The analysis of results reveals that integrating dispatching rules with ORR policies provides better system performance than using dispatching rules alone. The proposed ORR policy namely, backward scheduling with interval release policy provides better results than other ORR polices. © 2019 Inderscience Enterprises Ltd.
引用
收藏
页码:97 / 128
页数:31
相关论文
共 50 条
  • [11] SIMULATION STUDY OF JOB SHOP SCHEDULING WITH DUE DATES
    CHENG, TCE
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1988, 19 (03) : 383 - 390
  • [12] GASP SIMULATION STUDY OF JOB-SHOP SCHEDULING
    ASHOUR, S
    VASWANI, SD
    SIMULATION, 1972, 18 (01) : 1 - &
  • [13] Pareto Archived Simulated Annealing for Single Machine Job Shop Scheduling with Multiple Objectives
    Hanoun, Samer
    Nahavandi, Saeid
    Kull, Hans
    SIXTH INTERNATIONAL MULTI-CONFERENCE ON COMPUTING IN THE GLOBAL INFORMATION TECHNOLOGY (ICCGI 2011), 2011, : 99 - 104
  • [14] Discrete harmony search algorithm for flexible job shop scheduling problem with multiple objectives
    Gao, K. Z.
    Suganthan, P. N.
    Pan, Q. K.
    Chua, T. J.
    Cai, T. X.
    Chong, C. S.
    JOURNAL OF INTELLIGENT MANUFACTURING, 2016, 27 (02) : 363 - 374
  • [15] Discrete harmony search algorithm for flexible job shop scheduling problem with multiple objectives
    K. Z. Gao
    P. N. Suganthan
    Q. K. Pan
    T. J. Chua
    T. X. Cai
    C. S. Chong
    Journal of Intelligent Manufacturing, 2016, 27 : 363 - 374
  • [16] An algorithm for assembly job shop scheduling problem
    Wan, Xiao-Qin
    Yan, Hong-Sen
    Proceedings of the 2nd International Conference on Electronics, Network and Computer Engineering (ICENCE 2016), 2016, 67 : 223 - 227
  • [17] Production Scheduling and Worker Assignment Problems in Assembly Job Shop with Deterioration Effect
    Jiang, Tianhua
    Proceedings of the 2nd International Conference on Electronics, Network and Computer Engineering (ICENCE 2016), 2016, 67 : 664 - 669
  • [18] A neighborhood for complex job shop scheduling problems with regular objectives
    Reinhard Bürgy
    Journal of Scheduling, 2017, 20 : 391 - 422
  • [19] A neighborhood for complex job shop scheduling problems with regular objectives
    Burgy, Reinhard
    JOURNAL OF SCHEDULING, 2017, 20 (04) : 391 - 422
  • [20] An efficient genetic algorithm for job shop scheduling with tardiness objectives
    Mattfeld, DC
    Bierwirth, C
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 155 (03) : 616 - 630