共 50 条
- [1] JOB SHOP SCHEDULING WITH DUE DATES AND OVERTIME CAPABILITY [J]. MANAGEMENT SCIENCE SERIES A-THEORY, 1974, 21 (01): : 68 - 78
- [2] JOB SHOP SCHEDULING WITH DUE DATES AND VARIABLE PROCESSING TIMES [J]. MANAGEMENT SCIENCE SERIES A-THEORY, 1974, 20 (09): : 1264 - 1275
- [4] Determination of due dates in job shop scheduling by simulated annealing [J]. COMPUTER INTEGRATED MANUFACTURING SYSTEMS, 1996, 9 (02): : 65 - 72
- [5] Flow shop scheduling with two distinct job due dates [J]. Computers and Industrial Engineering, 2022, 163
- [6] Reverse algorithm of job-shop scheduling problem with due dates [J]. Xitong Gongcheng Lilum yu Shijian, 12 (25-30, 37):
- [7] A metaheuristic algorithm for simultaneous simulation optimization and applications to traveling salesman and job shop scheduling with due dates [J]. PROCEEDINGS OF THE 2007 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2007, : 1814 - 1822
- [8] Fuzzy due dates job shop scheduling problem based on neural network [J]. ADVANCES IN NEURAL NETWORKS - ISNN 2005, PT 1, PROCEEDINGS, 2005, 3496 : 782 - 787
- [9] Job Shop Scheduling with Fixed Delivery Dates [J]. INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTIST, IMECS 2012, VOL II, 2012, : 1412 - 1416
- [10] Study of simulation generator for job shop scheduling [J]. Wuhan Jiaotong Keji Daxue Xuebao, 6 (612-614):