共 50 条
- [41] Circuit Breaker Rate-of-Rise Recovery Voltage in Ultra-High Voltage Lines with Hybrid Reactive Power Compensation ENERGIES, 2018, 11 (01):
- [43] Restriction on secondary arc current on ultra-high voltage AC double circuit transmission lines on the same tower Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2010, 35 (10): : 83 - 88
- [45] Ultra-high vacuum protection system for synchrotron radiation beam lines with very high-power wigglers and undulators Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, 1999, 425 (03): : 599 - 607
- [46] Ultra-high vacuum protection system for synchrotron radiation beam lines with very high-power wigglers and undulators NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 1999, 425 (03): : 599 - 607
- [47] Precise Calculation of Dead Time in High Voltage Transmission Lines Using Network Equivalencing Method in Time Domain 2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
- [49] Economic Benefit and Improve of Stability in the Power System through the Ultra-High Speed Fault Clearing in Transmission Lines PROCEEDINGS OF THE 2018 IEEE 25TH INTERNATIONAL CONFERENCE ON ELECTRONICS, ELECTRICAL ENGINEERING AND COMPUTING (INTERCON 2018), 2018,