Nonlinear programming approach for spatial scheduling problem

被引:0
|
作者
Zhang, Zhi-Ying [1 ]
Chen, Jie [1 ]
机构
[1] School of Mechanical Engineering, Tongji University, Shanghai 200092, China
关键词
Scheduling - Ships - Shipbuilding - Integer programming - Shipyards;
D O I
暂无
中图分类号
学科分类号
摘要
To solve the spatial scheduling problem of blocks on multi nonempty working-plates in block assembly workshop, an integer nonlinear programming model was formulated which included the due date and precedence constraints of blocks simultaneously. The average spatiotemporal utilization ratio was defined and established as the benchmark in the model which evaluated time and space utilization simultaneously. Then, this model was extended to formulate some special spatial scheduling problems. Finally, application data were obtained from a shipyard to validate the model, and the result showed that the model performed well in the mentioned spatial scheduling problems.
引用
收藏
页码:1272 / 1278
相关论文
共 50 条
  • [21] A hybrid constraint programming approach to the log-truck scheduling problem
    El Hachemi, Nizar
    Gendreau, Michel
    Rousseau, Louis-Martin
    ANNALS OF OPERATIONS RESEARCH, 2011, 184 (01) : 163 - 178
  • [22] A hybrid constraint programming approach to the log-truck scheduling problem
    Nizar El Hachemi
    Michel Gendreau
    Louis-Martin Rousseau
    Annals of Operations Research, 2011, 184 : 163 - 178
  • [23] A constraint programming approach for solving unrelated parallel machine scheduling problem
    Gedik, Ridvan
    Kalathia, Darshan
    Egilmez, Gokhan
    Kirac, Emre
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 121 : 139 - 149
  • [24] A constraint programming approach for the resource-constrained project scheduling problem
    Olivier Liess
    Philippe Michelon
    Annals of Operations Research, 2008, 157 : 25 - 36
  • [25] Network configuration distributed production scheduling problem: A constraint programming approach
    Ziadlou, Ghazal
    Emami, Saeed
    Asadi-Gangraj, Ebrahim
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 188
  • [26] Stochastic programming approach for unidirectional quay crane scheduling problem with uncertainty
    Shoufeng Ma
    Hongming Li
    Ning Zhu
    Chenyi Fu
    Journal of Scheduling, 2021, 24 : 137 - 174
  • [27] A constraint programming approach for the resource-constrained project scheduling problem
    Liess, Olivier
    Michelon, Philippe
    ANNALS OF OPERATIONS RESEARCH, 2008, 157 (01) : 25 - 36
  • [28] Stochastic programming approach for unidirectional quay crane scheduling problem with uncertainty
    Ma, Shoufeng
    Li, Hongming
    Zhu, Ning
    Fu, Chenyi
    JOURNAL OF SCHEDULING, 2021, 24 (02) : 137 - 174
  • [29] Solving the spatial scheduling problem: a two-stage approach
    Zhang, Zhiying
    Chen, Jie
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (10) : 2732 - 2743
  • [30] Nonlinear programming approach for a transient free boundary flow problem
    Chakib, A
    Nachaoui, A