A hybrid constraint programming approach to the log-truck scheduling problem

被引:0
|
作者
Nizar El Hachemi
Michel Gendreau
Louis-Martin Rousseau
机构
[1] Interuniversity Research Centre on Enterprise Networks,
[2] Logistics and Transportation (CIRRELT),undefined
来源
关键词
Constraint Programming; Integer Program Model; Crew Schedule; Average Cycle Time; Constraint Programming Model;
D O I
暂无
中图分类号
学科分类号
摘要
Scheduling problems in the forest industry have received significant attention in the recent years and have contributed many challenging applications for optimization technologies. This paper proposes a solution method based on constraint programming and mathematical programming for a log-truck scheduling problem. The problem consists of scheduling the transportation of logs between forest areas and woodmills, as well as routing the fleet of vehicles to satisfy these transportation requests. The objective is to minimize the total cost of the non-productive activities such as the waiting time of trucks and forest log-loaders and the empty driven distance of vehicles. We propose a constraint programming model to address the combined scheduling and routing problem and an integer programming model to deal with the optimization of deadheads. Both of these models are combined through the exchange of global constraints. Finally the whole approach is validated on real industrial data.
引用
收藏
页码:163 / 178
页数:15
相关论文
共 50 条
  • [1] A hybrid constraint programming approach to the log-truck scheduling problem
    El Hachemi, Nizar
    Gendreau, Michel
    Rousseau, Louis-Martin
    [J]. ANNALS OF OPERATIONS RESEARCH, 2011, 184 (01) : 163 - 178
  • [2] Solving a log-truck scheduling problem with constraint programming
    El Hachemi, Nizar
    Gendreau, Michel
    Rousseau, Louis-Martin
    [J]. INTEGRATION OF AI AND OR TECHNIQUES IN CONSTRAINT PROGRAMMING FOR COMBINATORIAL OPTIMIZATION PROBLEMS, 2008, 5015 : 293 - 297
  • [3] A Hybrid LS/CP Approach to Solve the Weekly Log-Truck Scheduling Problem
    El Hachemi, Nizar
    Gendreau, Michel
    Rousseau, Louis-Martin
    [J]. INTEGRATION OF AI AND OR TECHNIQUES IN CONSTRAINT PROGRAMMING FOR COMBINATORIAL OPTIMIZATION PROBLEMS, PROCEEDINGS, 2009, 5547 : 319 - 320
  • [4] A heuristic to solve the synchronized log-truck scheduling problem
    El Hachemi, Nizar
    Gendreau, Michel
    Rousseau, Louis-Martin
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (03) : 666 - 673
  • [5] Flow-based integer linear programs to solve the weekly log-truck scheduling problem
    El Hachemi, Nizar
    El Hallaoui, Issmail
    Gendreau, Michel
    Rousseau, Louis-Martin
    [J]. ANNALS OF OPERATIONS RESEARCH, 2015, 232 (01) : 87 - 97
  • [6] Flow-based integer linear programs to solve the weekly log-truck scheduling problem
    Nizar El Hachemi
    Issmail El Hallaoui
    Michel Gendreau
    Louis-Martin Rousseau
    [J]. Annals of Operations Research, 2015, 232 : 87 - 97
  • [7] 'ELEGY FOR A LOG-TRUCK DRIVER'
    OCONNOR, M
    [J]. CHICAGO REVIEW, 1993, 39 (3-4) : 102 - 106
  • [8] LOG TRUCK SCHEDULING BY NETWORK PROGRAMMING
    SHEN, ZY
    SESSIONS, J
    [J]. FOREST PRODUCTS JOURNAL, 1989, 39 (10) : 47 - 50
  • [9] Constraint programming approach to a bilevel scheduling problem
    Kovacs, Andras
    Kis, Tamas
    [J]. CONSTRAINTS, 2011, 16 (03) : 317 - 340
  • [10] Constraint programming approach to a bilevel scheduling problem
    András Kovács
    Tamás Kis
    [J]. Constraints, 2011, 16 : 317 - 340