共 50 条
- [32] Excavation and Construction Technology of Diversion Tunnel under Complex Geological Conditions APPLIED SCIENCES-BASEL, 2023, 13 (20):
- [33] Risk management during construction of the Gotthard Base Tunnel GEOTECHNICAL MEASUREMENTS AND MODELLING, 2003, : 267 - 272
- [36] Injection measures at the Brenner Base Tunnel – Challenges for human and equipment Geomechanik und Tunnelbau, 2024, 17 (06): : 605 - 612
- [37] Brenner Base Tunnel, Lots Mules 2-3 (Italy): The construction experience of the emergency stop in Trens PROCEEDINGS OF THE ITA-AITES WORLD TUNNEL CONGRESS 2023, WTC 2023: Expanding Underground-Knowledge and Passion to Make a Positive Impact on the World, 2023, : 2087 - 2095
- [38] The construction method of starting tunnelling in special geological condition COMPUTER METHODS AND ADVANCES IN GEOMECHANICS, VOL 2, 1997, : 1413 - 1417
- [40] Technical visit to the works for the construction of the Brenner Base Tunnel Lots "Mules 2-3" and "Isarco Underpass" GALLERIE E GRANDI OPERE SOTTERRANEE, 2020, (133): : 51 - 55