共 50 条
- [22] Integration of reflection seismic data into the documentation during the construction of the Brenner Base Tunnel; [Einbindung von Reflexionsseismik in die Dokumentation beim Bau des Brenner Basistunnels] Geomechanik und Tunnelbau, 2017, 10 (05): : 552 - 560
- [25] Intrinsically safe in the tunnel construction under complex geological conditions PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1327 - 1330
- [26] Innovative TBM transport logistics in construction section H33 of Brenner Base Tunnel Morocutti, Alex (alex.morocutti@pini-partner.com), 1600, Ernst und Sohn (14): : 233 - 244
- [27] Virtual Technical Visit to the construction sites of BBT (Brenner Base Tunnel) "Isarco Underpass" Lot GALLERIE E GRANDI OPERE SOTTERRANEE, 2021, (138): : 75 - 76
- [29] Geomechanical loading of the segmental linings of the Brenner Base Tunnel Geomechanik und Tunnelbau, 2024, 17 (01): : 52 - 63
- [30] Feasibility study for the geothermal exploitation of the Brenner Base Tunnel GALLERIE E GRANDI OPERE SOTTERRANEE, 2018, (126): : 35 - 47