Inventory model for major equipment maintenance companies with fuzzy & discrete spare parts demands

被引:0
|
作者
Ren, Ming-Lun [1 ]
Huang, Shan [1 ]
Wang, Bao-Min [1 ]
机构
[1] School of Management, Hefei University of Technology, Hefei 230009, China
关键词
Fuzzy sets - Genetic algorithms;
D O I
暂无
中图分类号
F253.4 [库存、储备及调运管理];
学科分类号
摘要
To reduce spare parts inventory cost of large-scale equipment maintenance companies, an inventory model with discrete, uncertain spare parts demand using fuzzy theory was presented. In this model, the component renewal rate was denoted by using triangular fuzzy number to better address the discreteness and fuzziness of spare parts demands so as to obtain fuzzy prediction of spare parts demand. Fuzzy spare parts purchasing strategy was then set up by combining the fuzzy demand of spare part with the (t, R, S) inventory control method. This model was solved by genetic agorithm, and the optimal inspection period, maximal inventory level, order point, optimal order periods and lot-sizes were obtained. Effectiveness of this inventory model was verified by case study.
引用
收藏
页码:2233 / 2239
相关论文
共 50 条
  • [31] The value of maintenance delay flexibility for improved spare parts inventory management
    Basten, Rob J., I
    Ryan, Jennifer K.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 278 (02) : 646 - 657
  • [32] On the joint optimization of the periodic preventive maintenance and the spare parts inventory problem
    Mjirda, Anis
    Benmansour, Rachid
    Allaoui, Hamid
    Goncalves, Gilles
    IFAC PAPERSONLINE, 2016, 49 (12): : 881 - 885
  • [33] Joint Optimization of Preventive Maintenance and Spare Parts Inventory with Appointment Policy
    Cai, Jing
    Yin, Yibing
    Zhang, Li
    Chen, Xi
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2017, 2017
  • [34] Critical project planning and spare parts inventory management in shutdown maintenance
    Zhu, Sha
    van Jaarsveld, Willem
    Dekker, Rommert
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2022, 219
  • [35] Research on optimization of spare parts inventory policy considering maintenance priority
    Chen Y.-K.
    Gao Q.
    Su X.-B.
    Fang S.
    Guo C.-M.
    International Journal of System Assurance Engineering and Management, 2018, 9 (6) : 1336 - 1345
  • [36] COST OPTIMISATION OF SPARE PARTS INVENTORY IN TECHNICAL SYSTEMS MAINTENANCE PROCESSES
    Bojanic, Branislav
    Miletic, Boris
    Kondic, Zivko
    ECONOMIC AND SOCIAL DEVELOPMENT (ESD), 2016, : 224 - 233
  • [37] Critical project planning and spare parts inventory management in shutdown maintenance
    Zhu, Sha
    van Jaarsveld, Willem
    Dekker, Rommert
    Reliability Engineering and System Safety, 2022, 219
  • [38] Prediction Model Selection and Spare Parts Ordering Policy for Efficient Support of Maintenance and Repair of Equipment
    Nechval, Nicholas
    Purgailis, Mans
    Cikste, Kaspars
    Berzins, Gundars
    Rozevskis, Uldis
    Nechval, Konstantin
    ANALYTICAL AND STOCHASTIC MODELING TECHNIQUES AND APPLICATIONS, PROCEEDINGS, 2010, 6148 : 321 - +
  • [39] Research on the echelon inventory model of the repairable spare parts
    Zhang, Lin
    Zhao, Jie
    Tang, Chao
    Xie, Chong
    Fan, Wen-Xin
    Jiang, Ke
    Binggong Xuebao/Acta Armamentarii, 2009, 30 (SUPPL. 1): : 90 - 94
  • [40] A MINIMUM COST MODEL OF SPARE PARTS INVENTORY CONTROL
    WIGGINS, AD
    TECHNOMETRICS, 1967, 9 (04) : 661 - &